EDMS NO.
REV.
VALIDITY
1867100
1.0
RELEASED
REFERENCE
TOF-TAR-PRD-0001
Date: 2019-04-11
CERN
CH1211 Geneva 23
Switzerland
[DO
CUMENT TYPE]
nTOF – Target 2 Removal
Handling Tasks
(Sequence of Operations)
Abstract – This document outlines the tasks needed to remove n_TOF Target 2 in order
to allow its replacement with Target 3. The tasks include removal of the equipment and
items in the vertical beam pipe to gain access to the n_TOF target 2 from the technical
gallery. It is assumed the detectors and the associated equipment have been removed
before this work starts. This document identifies tasks where remote handling will be
required.
DOCUMENT PREPARED BY:
DOCUMENT CHECKED BY:
DOCUMENT APPROVED BY:
O. Aberle,
K. Kershaw,
JL. Grenard,
JF. Gruber,
S. Girod,
JM. Martin,
LR. Buonocore,
N. Roget
M. Calviani,
D. Grenier,
J. Vollaire,
F. Pozzi,
L. Ulrici,
M. Di Castro,
F. Dragoni,
A. Pardons,
O. Prouteau,
C. Bertone
S. Gilardoni,
M. Brugger,
M. Nonis,
I. Ruehl,
A. Masi,
R. Folch,
S. Roesler
Summary of Contents for ATOMTEX BDKG-24
Page 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Page 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Page 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Page 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...