![Centurion CP71 Installation Manual Download Page 12](http://html1.mh-extra.com/html/centurion/cp71/cp71_installation-manual_2582826012.webp)
CABLE
ENTRY
AREA
CONCRETE
SLAB
- Before pouring the concrete ensure that
the mounting plate is positioned correctly.
- The plate is not symmetrical. The two nuts
closest to the plate edge face towards the
door of boom enclosure.
- Tighten top and bottom nut to aid in
positioning the plate when the
concrete is poured.
- Place the plate above surface of concrete.
- Leave the concrete to dry.
- Unscrew the nuts and washers, and
remove them.
- Arrange enclosure in position and
clampe it between the mounting plate
and the holding down angle supplied
using the nuts and washers that were
removed.
BASE
PLATE
HOLDING
DOWN
ANGLE
M12 NUTS &
WASHERS
12
12
7.2.2 ALTERNATIVE 2
N
u
t
C
lo
s
e
s
t
to
e
d
g
e
CABLE
CONDUIT
Summary of Contents for CP71
Page 2: ...2 2...
Page 4: ...4 4...
Page 7: ...7 7 4 2 DETERMINATION OF OPERATIONAL MODE...
Page 16: ...16 16...
Page 21: ...21 21...
Page 28: ...28 28...
Page 38: ...34 34 38 38...
Page 39: ...39 39...