39
11. Select “START.” The instrument will begin the method according to the selected parameters – initializing,
ramping, holding, cooling, etc.
MTS-300 Temperature Control
12. If the instrument door is not properly closed or is opened during performance of a method, the following screen
will be displayed.
13. Ensure that the door is properly closed and select “Start” to resume the method. During the method, the following
screens may appear.
Detecting Vessels