![Cedar Summit F25720 Installation And Operating Instructions Manual Download Page 47](http://html1.mh-extra.com/html/cedar-summit/f25720/f25720_installation-and-operating-instructions-manual_2578707047.webp)
Step 15: Swing Beam Assembly
Part 2
Hardware
E:
On the Fort End of (150) Engineered SW Beam attach 2 Heavy Flat Brackets with 2 (G21) 5/16 x 3-3/4”
Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 15.6 and 15.7)
F:
Place (151) SW Mount in between both Heavy Flat Brackets and place 1 Heavy L-Bracket against (150)
Engineered SW Beam and (151) SW Mount. Attach with 1 (G17) 3/8 x 6” Hex Bolt (with 2 flat washers, plastic
formed washer and lock nut). (fig. 15.8)
G:
Attach (141) SW Mount to Heavy Flat Brackets with 2 (G21) 5/16 x 3-3/4” Hex Bolts (with 2 flat washers
and 1 lock nut). (fig. 15.9)
4 x
5/16 x 3-3/4” Hex Bolt
(5/16” flat washer x 2, 5/16” lock nut)
1 x
3/8 x 6” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
Other Parts
2 x Heavy Flat Bracket
1 x Heavy L-Bracket
G21
G17
Wood Parts
1 x
SW Mount 4 x 4 x 16”
151
G21
150
5/16” Flat
Washer
Fort End
5/16”
Lock Nut
5/16” Flat
Washer
Plastic
Formed
Washer
Heavy
Flat
Bracket
150
3/8”
Lock Nut
Fig. 15.6
Fig. 15.7
Fig. 15.9
Fig. 15.8
G17
G21
151
150
151
5/16” Flat
Washer
5/16” Flat
Washer
5/16”
Lock Nut
Heavy Flat
Bracket
Heavy
L-Bracket
3/8” Flat
Washer
3/8” Flat
Washer
47