20040801
4-9
Editing Cell Contents
(2) Use the dialog box that appears to configure the Fill Sequence operation as described
below.
Parameter
Description
Expr.
Input the expression whose results you want to input.
Var.
Specify the name of the variable whose value will change with each
step.
Low
Specify the smallest value to be assigned to the variable.
High
Specify the greatest value to be assigned to the variable.
Step
Specify the value that should be added to the variable value with
each step.
Start
Specify the starting cell from which the results of the expression
should be inserted.
•
The following shows how the Fill Sequence dialog box should appear after
configuring the parameters for our example.
Summary of Contents for Spreadsheet Application
Page 55: ...20040801 u Graph Line Clustered D u Graph Line Stacked F 8 2 Graphing ...
Page 56: ...20040801 u Graph Line 100 Stacked G u Graph Column Clustered H 8 3 Graphing ...
Page 57: ...20040801 u Graph Column Stacked J u Graph Column 100 Stacked K 8 4 Graphing ...
Page 58: ...20040801 u Graph Bar Clustered L u Graph Bar Stacked 8 5 Graphing ...
Page 74: ...CASIO COMPUTER CO LTD 6 2 Hon machi 1 chome Shibuya ku Tokyo 151 8543 Japan SA0410 B ...