SAFETY PRECAUTIONS
SR2-1-3
15501 9-35990
or near drop-offs.
The word “bulldozing” generally refers to work in
virgin rough terrain, characterised by the presence of
all the perils and risks listed above. We emphasise
the danger represented in these conditions by large
tree limbs (possibly falling on the machine) and large
r o o t s ( w h i c h m a y a c t a s a l e v e r a g e u n d e r t h e
m a c h i n e w h e n u p - r o o t e d a n d c a u s e t h e u n i t t o
overturn).
Position the machine dependent upon the loading
and unloading areas in order to swing leftwards to
load to obtain best visibility.
Never use the bucket or attachment as a man lift
or carry riders.
N e v e r u s e t h e m a c h i n e a s a w o r k p l a t f o r m o r
scaffolding. The machine must not be improperly
used for works not consistent with its features (such
as pushing railway cars, trucks or other machines).
Always pay attention to people within the machine
operating range.
Never move or stop the bucket, other loads or the
attachment above ground personnel or truck cabs.
Ensure the truck driver is in a safe place before
loading the truck.
Load trucks from side or rear.
U s e o n l y t h e t y p e o f b u c k e t r e c o m m e n d e d
considering machine type, materials to be handled,
material piling up and loading characteristics, ground
type and other typical conditions of the work to be
performed.
When travelling with a loaded bucket, keep it as
rolled-back as possible. Keep boom and dipper as
low as possible.
Ground speed should be adequate to the load and
ground conditions.
The load must always be properly arranged in the
bucket; move with extreme care when transporting
oversize loads.
Do not lift and move the bucket overhead where
persons are standing or working, nor downhill when
working on a slope as this would decrease machine
stability. Load the bucket from the uphill side.
Loads to be raised using the machine should be
exclusively hooked to the hitch specially provided.
The excavator is no lifting and transportation means,
therefore it should not be used to position loads
accurately. Should it be exceptionally used to lift and
lay building components, special caution must be
taken as follows:
– The machine should necessarily be equipped with
the special option supplied by
CASE
. Follow also
safety rules for the excavator used as lifting means.
– S e c u r e t h e l o a d s t o b e r a i s e d u s i n g c a b l e s o r
c h a i n s f a s t e n e d w i t h a p p r o p r i a t e h o o k i n g
mechanisms.
– Nobody should be allowed to remain under the
raised load or within the excavator operating range
for any reason whatever.
Never exceed specified loading capacity. Incorrect
fastening of slings or chains may cause boom/dipper
failure or failure of the lifting means with consequent
bodily injuries and even death.
Always ensure that slings and chains used for lifting
are adequate to the load and in good condition.
All loading capacities are referred to the machine
on a level surface and should be disregarded
when working on a slope.
Avoid travelling across slopes. Proceed from uphill
downhill and vice-versa. If machine starts slipping
sideways when on a slope, lower the bucket and
thrust bucket teeth into the ground.
Working on slopes is dangerous. Grade the working
area if possible. Reduce work cycle time if it is not
possible to grade the working area.
Do not move full bucket or a load from uphill downhill
as this would reduce machine stability. Do not work
with the bucket turned to the uphill side.
D o n o t w o r k w i t h t h e b u c k e t t u r n e d u p h i l l a s
counterweights protruding downhill would reduce
machine stability on the slope and increase risk of
overturning.
We recommend to work on slopes with the bucket
downhill, after checking machine stability with the
bucket empty and attachment retracted, by slowly
swinging the upperstructure by 360°.
P o s i t i o n t h e c a r r i a g e a t a r i g h t a n g l e r e l a t i v e t o
slopes, hanging walls, etc. to exit the working area
easily.
Be aware when the upperstructure is turned by 180°,
steering and travel controls are reversed.
Properly judge ground conditions with particular
attention to consistency of the area you are going to
work on.
Keep the machine sufficiently far from the ditch edge.
Never dig under the machine.
Should it be necessary to dig under the machine,
always ensure that digging walls are opportunely
propped up against landslide to prevent the machine
from falling into the trench.
Do not swing the upperstructure, raise the load or
b r a k e a b r u p t l y i f n o t r e q u i r e d . T h i s m a y c a u s e
accidents.
Prior to beginning the work near gas distribution
mains or other public utilities:
- Contact the company owner of the gas mains or its
nearest branch before starting the work. Look up
the number in the telephone directory.
- Define together which precautions should be taken
to guarantee work safety.
- Decrease work speed. Reaction time could be too
slow and distance evaluation wrong.
- W h e n w o r k i n g n e a r g a s m a i n s o r o t h e r p u b l i c
utilities installations, appoint a person in charge of
s i g n a l l i n g d u t i e s . T h i s p e r s o n w i l l h a v e t h e
responsibility of observing the machine, any part of
it and/or the load approaching the gas mains from a
Summary of Contents for WX90
Page 1: ...Excavator WX90 Service Manual Cre 9 35990...
Page 6: ...15501 9 35990 Find manuals at http best manuals com search s CASE 935990...
Page 14: ...HU1 3 4 FEATURES OF THE MANUAL WX90 15501 9 35990 NOTES...
Page 16: ...15501 9 35990...
Page 51: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...