![Case CX300C Operator'S Manual Download Page 59](http://html1.mh-extra.com/html/case/cx300c/cx300c_operators-manual_2567381059.webp)
3 - CONTROLS/INSTRUMENTS
FORWARD CONTROLS
Hand control levers and pedals
Arm and upperstructure swing left-hand
control lever
The speed of movement of the arm or the upperstructure
swing depends on the control lever tilt angle. In the inter-
mediate position two movements can be obtained simul-
taneously.
NOTE:
When the upperstructure swing control is re-
leased, the upperstructure may continue to rotate due to
the force of inertia. In this event, make allowance for the
extra movement by releasing the control slightly earlier.
VF3UDD-001
1
(1)
The arm extends.
(2)
The arm retracts.
(3)
The upperstructure turns to the left.
(4)
The upperstructure turns to the right.
VF3UDD-002
2
Boom and bucket right-hand control lever
The speed of movement of the boom or the bucket de-
pends on the control lever tilt angle. In the intermediate
position two movements can be obtained simultaneously.
FIQCKA-001
3
(5)
The boom lowers.
(6)
The boom raises.
(7)
The bucket retracts (filling).
(8)
The bucket extends (dumping).
FIQCKA-002
4
3-9
Summary of Contents for CX300C
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12...
Page 28: ...2 SAFETY INFORMATION QNTTT2 011B_TU 3 2 10...
Page 50: ...2 SAFETY INFORMATION 2 32...
Page 130: ...3 CONTROLS INSTRUMENTS 3 80...
Page 157: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 27...
Page 172: ...4 OPERATING INSTRUCTIONS 4 42...
Page 182: ...5 TRANSPORT OPERATIONS 5 10...
Page 272: ...6 MAINTENANCE 6 90...
Page 280: ...8 SPECIFICATIONS Working range 4M8ORU 002A 2 See next page for the values 8 6...
Page 282: ...8 SPECIFICATIONS 8 8...