![background image](http://html1.mh-extra.com/html/carrier/kgatw0601hsi/kgatw0601hsi_installation-instructions-manual_2563046038.webp)
Fig. 38—Two-Stage Condensing Furnace Wiring Diagram
A02255
GV
HI
M
GRN/YEL
C
NOTE #3
BRN
BLU
BRN
GRN/YEL
RED
RED
FRS
LS
NOTE #11
ORN
YEL
HSI
L1 NOTE #2
GND
NEUTRAL
FU2
FUSE OR CIRCUIT
BREAKER & DISCONNECT
SWITCH (WHEN REQ'D)
BLK
ILK
PL5
JB
1
2
SE
C
-1
LED
SE
C
-2
FU
SE
3
-A
M
P
PLT
ACRDJ
0.
5
A
M
P
@ 24
V
A
C
HU
M
TE
ST
/T
WI
N
ON
OFF
3
2
1
DL
Y
OF
F
LHT
W/W1
DHUM G
24V
om
C
W2
Y/Y2
R
Y1
TRAN
L1
PR
-1
EA
C
-1
OL
SP
A
R
E
-
1
BL
W
R
BH
T/
C
LR
BHI/
LO
R
C
OOL
LO
-H
E
A
T
HI
-HE
A
T
START
GRN/YEL
BLWM
NE
UT
RA
L -
L
2
EA
C
-2
RED
BLU
ORN
YEL
BLK
LO
MED LO
MED
HI
MED HI
RED
BLU
WHT
WHT
BRN
BRN
BLK
WHT
BLK
WHT
IHI/LOR
HSIR
IDR
LO
HI
HS
I
GRY
CONNECTION DIAGRAM
BLK
1
HSI
2
IDM
1
2
3
HI
COM
LO
SCHEMATIC DIAGRAM
(NATURAL GAS & PROPANE)
IDR
TO 115VAC FIELD-DISCONNECT SWITCH
ILK
EQUIPMENT
GROUND
1
2
3
HSIR
IHI/LOR
PL2
L2
L2
CAP-1
OL
START
BLWM
COM
LO
MED LO
MED
HI
MED HI
LO HEAT
SPARE-2
COOLING
SPARE-1
BHI/LOR
BHT/CLR
BLWR
EAC-2
EAC-1
TRAN
L2
L2
115VAC
24VAC
SEC 2
SEC 1
PR1
FU1
NOTE #6
PL1-8
GVR-2
HUM
R
ACR
PL1-12
HPSR
GV
LPS
NOTE #11
LGPS
(WHEN USED)
HPS
HI
PL1-2
PL1-4
PL1-3
PL1-10
PL1-5
W/W1
CPU
GVR-1
TEST/TWIN
DHUM
W2
Y/Y2
G
Y1
C
OM 24V
NOTE #3
C
M
PL1-1
LPS
(WHEN USED)
LGPS
WHT
FSE
PL1-9
PL1-11
PL1-7
LEGEND
ACR
AIR CONDITIONING RELAY, SPST (N.O.)
ACRDJ
AIR CONDITIONING RELAY DISABLE JUMPER
BHI/LOR
BLOWER MOTOR SPEED CHANGE RELAY, SPDT
BHT/CLR
BLOWER MOTOR SPEED CHANGE RELAY, SPDT
BLWR
BLOWER MOTOR RELAY, SPST-(N.O.)
BLWM
BLOWER MOTOR, PERMANENT-SPLIT-CAPACITOR
CAP 1, 2
CAPACITOR
CPU
MICROPROCESSOR AND CIRCUITRY
DHUM
DHUM CONNECTION
EAC-1
ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.0 AMP MAX.)
EAC-2
ELECTRONIC AIR CLEANER CONNECTION (COMMON)
FRS
FLAME ROLLOUT SW. -MANUAL RESET, SPST-(N.C.)
FSE
FLAME-PROVING ELECTRODE
FU1
FUSE, 3 AMP, AUTOMOTIVE BLADE TYPE, FACTORY INSTALLED
FU2
FUSE OR CIRCUIT BREAKER CURRENT INTERRUPT DEVICE
(FIELD SUPPLIED AND INSTALLED)
GND
EQUIPMENT GROUND
GV
GAS VALVE-REDUNDANT
GVR 1, 2
GAS VALVE RELAY, DPST-(N.O.)
HPS
HIGH-HEAT PRESSURE SWITCH, SPST (N.O.)
HPSR
HIGH-HEAT PRESSURE SWITCH RELAY, SPST (N.C.)
HSI
HOT SURFACE IGNITER (115VAC)
HSIR
HOT SURFACE IGNITER RELAY, SPST (N.O.)
HUM
24VAC HUMIDIFIER CONNECTION (0.5 AMP. MAX.)
IDM
INDUCED DRAFT MOTOR, 2-SPEED, SHADED POLE
IDR
INDUCED DRAFT MOTOR RELAY, SPST-(N.O.)
IHI/LOR
INDUCER MOTOR SPEED CHANGE RELAY, SPDT
ILK
BLOWER ACCESS PANEL INTERLOCK SWITCH, SPST-(N.O.)
JB
JUNCTION BOX
LED
LIGHT-EMITTING DIODE FOR STATUS CODES - AMBER
LGPS
LOW GAS PRESSURE SWITCH, SPST-(N.O.)
LPS
LOW-HEAT PRESSURE SWITCH, SPST (N.O.)
LS
LIMIT SWITCH, AUTO-RESET, SPST (N.C.)
OL
AUTO-RESET INTERNAL MOTOR OVERLOAD TEMPERATURE SWITCH (N.C.)
PCB
PRINTED CIRCUIT BOARD CONTROL
PL1
12-CIRCUIT PCB CONNECTOR
PL2
3-CIRCUIT PCB HSI & IDM CONNECTOR
PL3
6-CIRCUIT ICM MOTOR CONNECTOR (NOT SHOWN)
PL4
4-CIRCUIT IDM CONNECTOR
PL5
2-CIRCUIT HSI CONNECTOR
PLT
3-CIRCUIT FACTORY TEST CONNECTOR
TRAN
TRANSFORMER, 115VAC/24VAC
TEST/TWIN
COMPONENT TEST & TWINNING TERMINAL
JUNCTION
TERMINAL
CONTROL PCB TERMINAL
FACTORY POWER WIRING (115VAC)
FACTORY CONTROL WIRING (24VAC)
FIELD CONTROL WIRING (115VAC)
FIELD CONTROL WIRING (24VAC)
CONDUCTOR ON CONTROL PCB
FIELD WIRING SCREW TERMINAL
FIELD EARTH GROUND
EQUIPMENT GROUND
FIELD SPLICE
PLUG RECEPTACLE
PCB
PL1-6
L1
NOTE #10
L2
PL4
PL5
WHT
WHT
RED
BLK
PL2
IDM
N
O
TE #
8
1 A
M
P
@ 1
1
5 V
A
C
STATUS CODE
FU
1
N
O
TE #
6
PL1
1
SELECT CHART
SW
LO-HT
ONLY
BLOWER
OFF-DELAY
ON
OFF
1
ONLY
HEAT
LO
HEAT
NORM
2 3
90
SEC.
ON
OFF
1
2 3
120
SEC.
ON
OFF
2 3
150
SEC.
ON
OFF
2 3
180
SEC.
HPS
FACTORY SETTINGS
BL
W
HI HEAT
NOTE #5
*
*
*
SP
A
R
E
-2
FSE
RED
AC
RD
J
326797-101 REV. A
1. If any of the original equipment wire is replaced use wire rated for 105
∞
C.
2. Use only copper wire between the disconnect switch and the furnace junction box (JB).
3. This wire must be connected to furnace sheet metal for control to prove flame.
4. Symbols are electrical representation only.
5. Solid lines inside PCB are printed circuit board conductors and are not included in the legend.
6. Replace only with a 3 amp fuse.
7. Blower motor (BLWM) and inducer motor (IDM) contain internal auto-reset thermal overload switches (OL).
8. Neutral connections are interchangeable within the NEUTRAL connector block.
9. Blower motor speed selections are for average conditions, see installation instructions for optimum selection.
10. MED not available on some models.
11. Factory connected when LGPS is not used.
12. Ignition lockout will occur after four consecutive unsuccessful trials-for-ignition. Control will auto-reset after
three hours.
13. Blower-on delay: gas high-heat 60 seconds, gas low-heat 45 seconds, cooling or heat pump 2 seconds.
14. Blower off-delay: gas heating selections are 90, 120, 150, 180 seconds, cooling or heat pump 90 seconds or
5 seconds when dehumidify call is active.
NOTES:
P
R
IN
TED
C
IR
C
IU
T B
O
ARD
P
R
INTED
C
IR
C
IU
T B
O
ARD
FRS
LS
WH
T
WH
T
PL3
IDM
1
2
3
BL
K
4
G
RN/
Y
E
L
CAP-2
BRN
BRN
GRN
RE
D
WH
T
OL
/YEL
CAP-1
NOTE #2
OL
4
CA
P
-2
NOTE #9
—38—