INSTALLATION START-UP REQUEST CHECKLIST
Machine Model Number: 19FA
Serial Number:
To:
Attn:
Date
Project Name
Carrier Job Number
The following information provides the status of the chiller installation.
YES/NO
(N/A)
DATE TO BE
COMPLETED
1. The machine is level.
2. The machine components are installed and connected in
accordance with the installation instructions.
3. The isolation package and grouting (if necessary)
are installed.
4. The relief valves are piped to the atmosphere.
5. All piping is installed and supported. Direction of flow
is indicated in accordance with the installation instructions
and job prints.
a. Chilled water piping
b. Condenser water piping
c. Waterbox drain piping
d. Oil cooler water piping
e. Pumpout unit condenser water piping (if installed)
f. Other
6. Flow switches are installed on both cooler and
condenser water loops.
7. Gages are installed as called for on the job prints required
to establish design flow for the cooler and condenser.
a. Water pressure gages IN and OUT
8. The machine’s starter wiring is complete. The wiring is
installed per installation instructions and certified prints.
a. Power wiring to compressor motor. (Motor leads will
not be taped until the Carrier technician megger tests
the motor.)
b. Oil pump wiring
c. Oil heater/control wiring
d. Flow switch wiring on cooler and condenser
e. Other
9. The motor starter has not been supplied by Carrier. It
has been installed according to the manufacturer’s
instructions.
10. The motor starter has not been supplied by Carrier and it
has been checked for proper operation.
COMMENTS:
CL-1
Summary of Contents for HFC-134a
Page 40: ...Figure 1 Model Number Identification ...
Page 41: ...Figure 2 Typical 19FA Installation 1400 2200 Tons 4922 7735 kW ...
Page 42: ...Figure 3 Machine Rigging Guide 3 Indicates center of gravity ...
Page 44: ...Figure 5 Machine Footprint ...
Page 45: ...Figure 6 Machine Contact Surfaces with Anchor Bolts ...
Page 51: ...Figure 12 Water Piping Oil Cooler to Chilled Water Circuit Typical ...
Page 52: ...Figure 13 Pumpout Unit ...
Page 53: ...Figure 14 Typical 19FA Relief Valve Tree for Storage Vessel ...
Page 54: ...Figure 15 Compressor Terminal Arrangement 18 Lead Rear Inlet ...
Page 55: ...Figure 16 Compressor Terminal Arrangement 18 Lead Top Inlet ...
Page 56: ...Figure 17 Compressor Terminal Arrangement 18 Lead Side Inlet ...
Page 57: ...Figure 18 Oil Pump Wiring ...
Page 58: ...Figure 19 Oil Heater and Control Power Wiring ...
Page 59: ...Figure 20 Pumpout Unit Controls ...
Page 60: ...Figure 21 Pumpout Unit Wiring Schematic ...
Page 61: ...Figure 22 Carrier Comfort Network Communication Bus Wiring ...
Page 62: ...Figure 23 COMM1 CCN Communication Wiring For Multiple Chillers Typical ...
Page 63: ...Figure 24 Typical 19FA With Free Standing Starter ...
Page 65: ...Figure 26 19FA Insulation ...