ComfortVu™ BACnet Thermostat Plus Model TBPL-H (Line voltage)Carrier Proprietary and Confidential
CARRIER CORPORATION ©2020
Installation and Operation Guide
All rights reserved
36
Wiring and DIP switch configurations 34 to 37 – FC systems - 4-pipe
Outputs
Config: 34:
4-Pipe, Fan VFS, Cool
valve PID
Config: 35:
4-Pipe, 1/2/3 Speeds
fan
(1)
, Heat valve PID
Config: 36:
4-Pipe, Fan VFS, Heat
valve PID
Config: 37:
4-Pipe, Fan VFS
11
X
Fan high
X
X
12
Economizer
(5)
(option – SW2.6 ON)
Fan medium
(or Economizer
(5)
)
Economizer
(5)
(option – SW2.6 ON)
Economizer
(5)
(option – SW2.6 ON)
13
X
Fan low
X
X
14
Heat element
(2)
(2nd stage heat)
Heat element
(2)
(2nd stage heat)
Heat element
(2)
(2nd stage heat)
Heat element
(2)
(2nd stage heat)
15
X
Cool valve
(3)
Cool valve
(3)
Cool valve
(3)
16
Heat valve
(1st stage heat)
X
X
Heat valve
(1st stage heat)
AO1
Cool valve PID
(3)
Heat valve PID
(1st stage heat)
Heat valve PID
(1st stage heat)
X
AO2
Fan VFS
X
Fan VFS
Fan VFS
SW1
SW2
(1)
SW1.1, SW1.2 – Fan speeds:
1 speed (Low):
2 speeds(Low and High):
3 speeds(Low, Medium, and High):
SW1.1 = ON, SW1.2 = OFF
SW1.1 = OFF, SW1.2 = ON
SW1.1 = OFF, SW1.2 = OFF
(2)
SW1.4 – 2nd heating stage:
ON = Enable, OFF = Disable
(3)
SW1.5 – Chilled beam option:
ON = Enable chilled beam (fan will not run with 1st stage cooling)
(4)
SW2.3 – Dehumidification:
ON = Use dehumidifier
OFF = Use reheat for dehumidification
(5)
SW2.6 – Terminal 12 operation:
ON = Economizer
OFF = Fan Medium (3 speeds) / Terminal not in use (1/2 speeds/VFS)
Important: Economizer will not work in 3 fan speeds configuration.
See drawing in
Wiring terminals and DIP switches
(page 23) for DIP switch locations.
Fan on/off: 110-230 Vac, 2.5A max.
Fan VFS, PID valves: 0-10 Vdc, 0.5 mA Not isolated
Control – Heat elements, Cool/Heat valves, Economizer: 110-230 Vac, 0.3A max.
Summary of Contents for ComfortVu Plus TBPL-H
Page 70: ......
Page 71: ...CARRIER CORPORATION 2020 Catalog No 11 808 706 01 4 7 2020 ...