24
ERV Wheel
TOP VIEW
A
B
30 1/12"
27"
2 3/4"
20"
Accessory Transition
(Includes front panel)
62M Unit
Rooftop Unit
ERV Curb
Rooftop Unit
62M075-120 ERV Unit
ERV Curb
Locator pieces
(included with
ERV Curb)
Rooftop Unit Curb
Accessory
Transition
Side View A-A
20"
Rooftop
Unit
Curb
ERV
Unit
Curb
A
A
Curb Detail
Locator
pieces
(included with
ERV curb,
must be watertight)
ROOFTOP MODEL
ROOFTOP SIZE
62M TRANSITION
ERV CURB
DIMENSIONS (in.)
A
B
48/50PG
03-07
62M-ATR-PG26-H
62M-A-CRB-14MC
80
5
/
16
44
11
/
16
08-14
62M-ATR-PG712-H
62M-A-CRB-14MC
92
3
/
4
53
15
/
16
LEGEND
NOTE: When using a 62M ERV unit coupled with
a Carrier rooftop unit, the rooftop factory or field-
installed economizer cannot be used.
ERV
—
Energy Recovery Ventilator
ROOF CURB LOCATION DETAIL
Fig. 25 — 62MD,ME075,120 Coupled with Carrier 48/50PG03-14 Horizontal Discharge Rooftop Unit
Summary of Contents for 62MB
Page 81: ......