15
Fig. 11 —
09FC Unit Dimensions
MOUNTING UNITS
When unit is in proper location, use of mounting holes in base
rails is recommended for securing unit to supporting structure.
Fasteners for mounting unit are field supplied. See Fig. 5-11. Be
sure unit is level to within
1
/
8
in. (3.2 mm) per foot for factory sup
-
plied drains to operate properly.
NOTE: For units that are point loaded, such as those using rubber
and shear isolators, the base rail must be supported with a 24 x
4 in. (610 x 102 mm) plate at each mounting location, or base rail
deflection may result. See Fig. 12-15. Fasten the unit to the plates
using the mounting holes.
Summary of Contents for 09FC020
Page 8: ...8 Fig 5 09FC 020 Unit Dimensions...
Page 9: ...9 Fig 6 09FC 030 Unit Dimensions...
Page 10: ...10 Fig 7 09FC 040 Unit Dimensions...
Page 11: ...11 Fig 8 09FC 050 Unit Dimensions...
Page 12: ...12 Fig 9 09FC 060 Unit Dimensions...
Page 13: ...13 Fig 10 09FC 070 Unit Dimensions...
Page 14: ...14 Fig 11 09FC 080 Unit Dimensions...
Page 69: ......