Car Park 3
–
Planning and design
21
Next Steps
Installation and configuration
After finishing the planning process, the installation can start: wires pulling, rails installation and
mounting of sensors, displays and cabinets.
Using the UWP 3 Tool software, the installer can then program and test the parts of the installation
before the entire installation is finished. When bases, sensors and CMCGs are connected and
powered, they can be tested and programmed before the rest of the system is completed.
Software and Web server
The last part is programming the system via the UWP 3.0 Tool.
In systems with more than one UWP 3.0, the installer must program each one independently.
In smaller systems (with maximum 630 bays) the CPY Server is integrated in the UWP 3.0.
In larger systems, a dedicated SBP2CPY24 CPY Server is required to control and monitor all the
I/O s in the entire system.
Thanks to the CPY Server, the installer can design the carpark with drawings, see alarms,
historical data, vacancy bay by bay or in lanes, occupancy data and many other features.
The carpark software can be programmed in advance and installed at the very moment the
physical installation is finished.