![Carl Valentin Spectra II Series Operating Manual Download Page 10](http://html1.mh-extra.com/html/carl-valentin/spectra-ii-series/spectra-ii-series_operating-manual_2558336010.webp)
Safety Instructions
Spectra II Series
10
Betriebsanleitung
10.16
2.1 Operating Conditions
Before initial operation and during operation
these operating
conditions have to be observed to guarantee save and interference-
free service of our printers.
Therefore please carefully read these operating conditions.
Shipment and storage of our printers are
only
allowed in original
packing.
Installation and initial operation of printer is only allowed if operating
conditions were
fulfilled
.
Initial operation, programming, operation, cleaning and service of our
printers are only recommended after careful study of our manuals.
Operation of printer is only allowed by especially trained persons.
NOTICE!
Perform trainings regularly.
Content of the training are chapter 2.1 (Operating Conditions),
chapter 5 (Loading Media) and chapter 7 (Maintenance and
Cleaning).
These indications are also valid for someone else's equipment
supplied by us.
Only use original spare and exchange parts.
Please contact the manufacturer with respect to spare/wear parts.
The installation place of printer should be even, free of vibration and
currents of air are to be avoided.
The printers have to be installed to ensure optimal operation and
servicing.
The installation of the power supply to connect our printers has to be
effected according to the international rules and regulations,
especially the recommendations of one of the three following
commissions:
International Electronic Commission (IEC)
European Committee for Electro technical Standardisation
(CENELEC)
Verband Deutscher Elektrotechniker (VDE)
Our printers are constructed according to VDE and have to be
connected to a grounded conductor. The power supply has to be
equipped with a grounded conductor to eliminate internal interfering
voltage.
Conditions for
installation place
Installation of
power supply