32
docs.carbide3d.com
33
12.
Use the 4mm hex key and one (1) M5
×
10mm
socket head cap screw to attach the belt clip
to the Y2-carriage. Insert the screw from the
OUTSIDE
and tighten. Do not over tighten
as this could bend the X-motor pulley. See
Figure 5‑11
.
Install the Y1‑Rail Belt
1. Attach a belt clip to one end of one of the two
remaining belts. (Refer back to
Figure 5‑4
.)
2. Set the belt clip on top of the Y1-rail next to
the front endplate. The belt should lay flat,
teeth down, and extend along the Y1-rail
towards the Y1-carriage. Ensure the teeth of
the bottom 2 inches of belt interlock with the
top. See
Figure 5‑12
.
3.
Use the 4mm hex key and one (1) M5
×
10mm
socket head cap screw to attach the belt clip
to the front endplate. Insert the screw from the
FRONT
and tighten. See
Figure 5‑12
.
4. Feed the belt under the two idlers on the
outside of the Y1-carriage. Make sure the belt
does not twist and the teeth remain facing
down all the way to the rear endplate. See
Figure 5‑13
.
Do not attach the other end of the belt just yet.
5. Slide the 3mm hex key under the belt, between
the two idlers, and use it as a lever against the
Y1-rail to push a loop of belt up between the
two idlers as shown in
Figure 5‑14
.
6.
Use the 3mm hex key to hook the belt and pull
it up between the two idlers.
7. Make sure the belt has not twisted and
the teeth are still facing down, then place
the belt loop over the Y1-motor pulley. See
Figure 5‑15
.
8. Very gently take the slack out of the belt by
slowly pulling the free end toward the rear
endplate.
9.
Attach another belt clip to the free end of the
belt. (Refer back to
Figure 5‑4
.)
10. Adjust the amount of belt you feed through
the second belt clip so that when it is laid flat
against the Y1-rail (with the slack removed,
but without stretching it) a 1
/
8
-inch gap exists
between the belt clip and the rear endplate.
Ensure the teeth of the bottom few inches of
belt interlock with the top. See
Figure 5‑16
.
11.
Use the 4mm hex key and one (1) M5
×
10mm
socket head cap screw to attach the belt clip
to the rear endplate. Insert the screw from the
BACK
and tighten. Do not over tighten as this
could bend the Y1-motor pulley.
Install the Y2‑Rail Belt
1. Install the remaining belt on the Y2-rail,
following steps 1-11 of the “Install the Y1-Rail
Belt” section above.
PRO TIP:
The Y2-belt installation is a mirror
image of the Y1-belt process.
NOTE:
The belt should be tight enough to
snap against the Y1-rail when gently lifted.
NOTE:
The belt should be tight enough to
snap against the X-rail when gently lifted.
Figure 5-11
Figure 5-12
Figure 5-13
Figure 5-14
Figure 5-15
Figure 5-16