Chapter 2
2-10
F-2-10
<Buffer/Processing Tray Path (Destination: Tray 1/ Tray 2)>
This is the copy ejection path when the equipment is set to sort for A4, B5, or LTR paper size. Feed two sheets of
paper to buffer (two or three sheets if 2-point stapling). Then they are aligned and stapled in the processing tray and
ejected. Even while stapling or offset is being performed, simultaneous stack ejection, which simultaneously ejects
copies delivered to the buffer and post processed stack in the processing tray, is performed because copies are
received continuously from the host machine. The stack delivered from the buffer is ejected to the processing tray
and the stack processed in the processing tray is ejected to the tray.
Simultaneous stack ejection operation is described below for two A4 copies between stacks when the equipment is
set to sort.
1) When the 1st paper reaches the switchback point, it is sent to the buffer unit and the rear end of the paper is held
by the buffer guide.
Feed roller
Buffer roller
Stack ejection roller
1st delivery roller
Paper
Paper
Processing tray
Rear end assist
Inlet roller
Summary of Contents for Saddle Finisher-T2
Page 1: ...Feb 21 2005 Service Manual Finisher Sorter DeliveryTray Saddle Finisher T2 ...
Page 2: ......
Page 6: ......
Page 15: ...Chapter 1 Specifications ...
Page 16: ......
Page 18: ......
Page 28: ......
Page 29: ...Chapter 2 Functions ...
Page 30: ......
Page 32: ......
Page 95: ...Chapter 3 Parts Replacement Procedure ...
Page 96: ......
Page 102: ......
Page 111: ...2 Remove two screws 1 and remove the escape door 2 F 3 33 2 1 ...
Page 182: ...F 3 325 2 1 3 2 2 ...
Page 183: ...Chapter 4 Maintenance ...
Page 184: ......
Page 225: ...Chapter 4 4 39 F 4 39 5 Select Register F 4 40 6 Select OK and register the data ...
Page 241: ...Chapter 5 Error Code ...
Page 242: ......
Page 244: ......
Page 261: ...Feb 21 2005 ...
Page 262: ......