Chapter 2
2-18
2.1.31 Transport driven roller 1 (Cover transport
entrance) (15 million sheets)
0024-6848
1) Remove the springs [1] to remove the transport driven roller 1 [2].
F-2-74
F-2-75
2.1.32 Before replacing the transport driven roller 1
(Cover transport exit) (15 million sheets)
0024-6857
1) Remove the rear cover.
Reference[Removing the Rear Cover]
2) Draw out the cover transport assembly.
Reference[Drawing
out the Cover Transport Assembly]
2.1.33 Transport driven roller 1 (Cover transport exit) (15
million sheets)
0024-6850
1) Remove the springs [1] to remove the transport driven roller 1 [2].
F-2-76
F-2-77
2.1.34 Before replacing the transport driven roller 2
(Spine bending roller 2/3 unit) (15 million sheets)
0024-6849
1) Remove the rear cover.
Reference[Removing the Rear Cover]
2) Draw out the cover transport assembly.
Reference[Drawing
out the Cover Transport Assembly]
3) Remove the cover horizontal registration unit.
Reference[Re-
moving the Cover Horizontal Registration Unit]
NOTE:
There is a groove on the roller shaft to slide the slit of the roller shaft mount.
Remove and install the transport driven roller sliding the groove.
[1]
[2]
[1]
NOTE:
There is a groove on the roller shaft to slide the slit of the roller shaft mount.
Remove and install the transport driven roller sliding the groove.
[1]
[2]
[1]
Summary of Contents for Perfect Binder-C1
Page 2: ......
Page 6: ......
Page 9: ...Chapter 1 Replacement Parts ...
Page 10: ......
Page 11: ...Contents Contents 1 1 List of Replacement Parts 1 1 ...
Page 12: ......
Page 14: ......
Page 15: ...Chapter 2 Parts Replacement Procedure ...
Page 16: ......
Page 52: ......
Page 53: ...Sep 29 2009 ...
Page 54: ......