Chapter 2
2-15
18) Remove the Alignment rack (front) [1] and the Alignment rack (rear) [2].
- Each 2 screws [3]
F-2-63
2.1.20 Alignment Motors (front/rear) (M4/M5) (15 million
sheets)
0024-6682
1) Open the top cover.
2) Remove the alignment assembly top cover [1].
- 4 screws [2]
F-2-64
3) Remove the alignment motors (front) [1] and (rear) [2].
- Each one connector [3]
- Each 2 screws [4]
F-2-65
2.1.21 Replecement parts in cover transport assembly
0024-6684
T-2-2
2.1.22 Before replacing the transport roller 1 (15 million
sheets)
0024-6687
1) Remove the rear cover.
Reference[Removing the Rear Cover]
2) Draw out the cover transport assembly.
Reference[Drawing
out the Cover Transport Assembly]
2.1.23 Transport roller 1 (15 million sheets)
0024-6840
1) Remove the E-ring [1] and bearing [2].
F-2-66
[1]
[2]
[3]
[3]
[2]
[1]
[2]
[4]
[3]
[4]
[1]
[2]
[3]
No.
Parts Name
Q'ty
[1]
Transport roller 1
1
[2]
Transport roller 2
1
[3]
Transport roller 3
1
[4]
Transport roller 4
1
[5]
Transport roller 5
1
[6]
Transport driven roller 1
12
- Transport driven roller 1 (Cover transport entrance)
(4)
- Transport driven roller 1 (Cover transport exit)
(8)
[7]
Transport driven roller 2
16
- Transport driven roller 2 (Spine bending roller 2/3
unit)
(4)
- Transport driven roller 2 (Spine bending unit (right))
(4)
- Transport driven roller 2 (Spine bending unit (left))
(4)
- Transport driven roller 2 (Delivery roller 1/2 unit)
(4)
[8]
Delivery roller 1
1
[9]
Delivery roller 2
1
[10]
Spine bending harness (right)
1
[11]
Spine bending harness (left)
1
[2]
[1]
Summary of Contents for Perfect Binder-C1
Page 2: ......
Page 6: ......
Page 9: ...Chapter 1 Replacement Parts ...
Page 10: ......
Page 11: ...Contents Contents 1 1 List of Replacement Parts 1 1 ...
Page 12: ......
Page 14: ......
Page 15: ...Chapter 2 Parts Replacement Procedure ...
Page 16: ......
Page 52: ......
Page 53: ...Sep 29 2009 ...
Page 54: ......