Chapter 2
2-11
2.1.17 SB flapper unit (15 million sheets)
0024-6837
1) Remove the SB flapper unit [1].
- E-rings [2] 2 pcs.
- Bushings [3] 2 pcs.
F-2-44
2.1.18 Before replacing the alignment rack (front)/
alignment rack (rear) (15 million sheets)
0024-6658
1) Remove the top cover.
2) Remove the front upper cover.
Reference[Removing the
Front Upper Cover]
3) Remove the rear upper cover.
Reference[Removing the Rear
Upper Cover]
Reference[Removing the Rear Cover]
5) Remove the left upper cover.
Reference[Removing the Left
Upper Cover]
2.1.19 Alignment rack (front)/Alignment rack (rear) (15
million sheets)
0024-6674
1) Remove the harness cover [1].
- 2 screws [2]
F-2-45
2) Go around to the back of the machine, and then remove the top cover and
rear upper cover.
3) Remove the E-ring [1], flange [2], belt [3], pulley [4], and parallel pin [5].
F-2-46
4) Remove the E-ring [1] and bearing [2].
F-2-47
5) Disconnect the two connectors [1].
F-2-48
[2]
[1]
[3]
[3]
[2]
[2]
[1]
CAUTION:
Be careful not to drop parts into the machine.
CAUTION:
Be careful not to drop parts into the machine.
[1]
[2]
[3]
[4]
[5]
[2]
[1]
[1]
Summary of Contents for Perfect Binder-C1
Page 2: ......
Page 6: ......
Page 9: ...Chapter 1 Replacement Parts ...
Page 10: ......
Page 11: ...Contents Contents 1 1 List of Replacement Parts 1 1 ...
Page 12: ......
Page 14: ......
Page 15: ...Chapter 2 Parts Replacement Procedure ...
Page 16: ......
Page 52: ......
Page 53: ...Sep 29 2009 ...
Page 54: ......