6
6
6-15
6-15
Installation > Installation Procedure > Operation Checks
Installation > Installation Procedure > Operation Checks
Making Checks after Completion of Installation Work
Take back the following parts which are no longer necessary:
[1]Cover of the Buffer Pass Unit
2pcs.
[2]Power cord
2pcs.(230Vmodel)
[3]Binding-head screw(M4x10)
1pce.
Operation Checks
1) After completion of installation, connect the power plug of the host machin and equipment to the power
outlet. Then open the switch cover and turn ON the main power switch.
2) In the operation check mode, check for cover sheet insertion operation
Summary of Contents for K1
Page 4: ...0 0 ...
Page 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts ...
Page 34: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic services items ...
Page 69: ...5 5 Adjustment Adjustment Adjustment at Time of Parts Replacement ...
Page 90: ...7 7 Appendix Appendix Service Tools General Circuit Diagram ...