6
6
6-7
6-7
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
Installation Procedure
Preparation for Installation on Upstream Connection Machine Side
1) .Remove two covers.
2) Secure the two bundled clamp plates and positioning pin to the host machine
each with two bundled RS tight screws(M4 x 8).At this time,secure the supplied
ground plate along with the rear latch catch.
x6
F-6-6
F-6-6
F-6-7
F-6-7
Summary of Contents for K1
Page 4: ...0 0 ...
Page 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts ...
Page 34: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic services items ...
Page 69: ...5 5 Adjustment Adjustment Adjustment at Time of Parts Replacement ...
Page 90: ...7 7 Appendix Appendix Service Tools General Circuit Diagram ...