CANNON Instrument Company | Unpack & Assemble
13
6.
Uncoil the cables from the heaters, float switch and control/overtemp probes, and then lower
the ends of the cables through the vertical channel at the rear of the bath.
7.
Install the thermoelectric cooler by sliding it through the circular 2” aperture that will be enclosed
by the housing. Refer to
Figure 7: Install TE Cooler
8.
Tighten the two tab screws (one on each side of the finned tube). During tightening,
the tabs will orient and seat against the bottom of the bath cover to secure the
thermoelectric cooler to the bath cover. Refer to
Figure 8: Tighten the Two Tabs
Caution:
Make certain that, during installation, the tabs are oriented so they
clear the edges of the aperture.
9.
Attach the two matching white power supply connectors together. Refer to Figure 9.
Summary of Contents for CT-500
Page 1: ...25 9991 Instruction Operation Manual Constant Temperature Bath CT 500 600 Series ...
Page 2: ......
Page 4: ......
Page 8: ......