Install Bracket Top Rail.

FIGURE #8

Bottom Cells Installed.

4

Leveling:

With all support rails (not all side) rails and covers in place, the rack needs to be checked for level

and square.  Shim frames as necessary to obtain level and squareness.  Shims are not supplied by C&D. 
With all frames level and square, torque cross brace bolts then torque the support rail to frame bolts. 
Torque anchor bolts to manufacturer’s recommended value.

5

Install Inward Bracket of Battery Restraint Brackets:

Install partially assembled battery bracket in approximate
location with hardware loose, so bracket may slide into
exact location at a later step in the installation. This
bracket may not be required, depending on the rack
drawings. See Figure #7 and Detail #4.

IMPORTANT STEP: 

Place front restraint rail and cover on frame cross member (top and bottom rows) to be installed after all batteries 

are in place. These rails should be slid up into position rather than dropped down from the top. 

6

Cell Installation Procedure:

If not instructed otherwise, install cells starting at the center of the bottom row

and working out to each end, install cell foam battery spacers as supplied if indicated by drawings. 

7

Battery Restraint Bracket Assembly:

Install the

tie rods and covers of the battery restraint bracket
assembly. See Detail #4. If batteries are completely
installed before this step, installing tie rods and 
covers will be very difficult.

8

Cell Installation Procedure Continued:

Do not use

oil, grease or any other lubricating agent, as a lubricant
for sliding batteries into place. Use a small amount 
of water or unscented talcum powder to help reduce 
friction on rail cover. Pay close attention to the 
polarities and terminal placement. Refer to the 
battery’s Installation and Operating Instructions 
Manual for more details.  All cells should be pushed 
back against the back restraint rail and cover. 
Repeat this procedure for all remaining rows and 
tiers. Completely finish the bottom row before 
starting the top row. 

Take all necessary saf

9

Front Restraint Rails:

With th

slide the front side restraint rail
place.  See Figure #9.  There s
of 1/8” gap between side restra
batteries.  If there is interferenc
rail, confirm that the battery is p
for single row and towards the 
row racks.  If there is still interf
contact C&D immediately. If the
than 1/8” (3mm), contact C&D 

10

Battery Restraint Bracket:

Co

of battery restraint brackets, re

11

Install End Restraint Rails an

Install corner brackets, end rail
Position end restraint rail and c
of battery. See Figure #10 and 

RSO1942  2/18/03  4:08 PM  Page 2

Summary of Contents for L Series

Page 1: ...responsibility of the customer to secure racks in accordance with allowable floor loading applicable codes and regulations Grounding Rack grounding provisions are integrated into the base of each fram...

Page 2: ...ufacturers instructions for tools required to install floor anchoring hardware INSTALLATION DETAILS Bolted connection details are located at the end of installation manual for reference Torque values...

Page 3: ...support rail s in location using supplied 3 8 bolt lock washer and serrated strut nut Ensure that the strut nut has properly engaged the strut 3 Installing Support Rails Install support rails from th...

Page 4: ...ings 7 Battery Restraint Bracket Assembly Install the tie rods and covers of the battery restraint bracket assembly See Detail 4 If batteries are completely installed before this step installing tie r...

Page 5: ...en side restraint rails and covers to batteries If there is interference between battery and rail confirm that the battery is pushed to the back for single row and towards the center for double row ra...

Page 6: ...ll and inter unit connectors and cable assemblies as specified by the battery arrangement Refer to battery installation manual for more detail on battery connections ADDITIONAL INSTRUCTION FOR MULTI R...

Page 7: ...0 Frame Typical for Both Side Restraint and Bottom Rails Serrated Nut Strut For Support Rails or Side Rails Lock Washer 3 8 Bolt 3 8 16 x 1 00 Bolt 3 8 16 x 1 00 Note Bolt head must be facing Battery...

Page 8: ...rrated Strut Nut 5 16 18 Nut and 5 16 Lock Washer 3 8 16 x 1 00 Bolt and 3 8 lock washer DETAIL 5 End Restraint Assembly Detail 2022 C D Technologies Inc Any data descriptions or specifications presen...

Reviews: