RS 1942

TORQUE VALUES

Hardware Type

Torque Value

3/8”-16 Bolt, Nut and Lock Washer

15-20 Ft.-lbs (20-27 N•m)

1/2”-13 Bolt,  Nut and Lock Washer

55-65 Ft.-lbs. (75-88 N•m)

3/8”-16 Bolt, Strut Nut and Lock Washer

19 Ft.-lbs. (25 N•m)

MATERIAL VERIFICATION

Battery racks are shipped unassembled with a complete 
set of related drawings and documentation. Check received
parts and quantities against the rack’s Bill of Materials 
(reference Table #1) on the provided drawing or packing list.
Do not assemble rack if parts are missing or quantities are
incomplete. Please contact C&D’s customer service, 
800-543-8630 with any problems.

REQUIRED TOOLS

Torque wrench (0 to 120 ft.-lb.) with hex sockets for 3/8”

and 1/2” hardware. Adjustable wrench or 3/8” and 1/2” box

wrench, tape measure, square and leveling device.  
Note: Consult manufacturers’ instructions for tools 
required to install floor anchoring hardware.

INSTALLATION DETAILS

Bolted connection details are located at the end of 
installation manual for reference. Torque values for 
hardware are shown in Table #2.

LOCATION OF RACK

When determining the rack location and floor anchor pattern, 
use applicable drawings provided with rack shipment. 
Locate the racks’ general position, considering boundary 
and aisle clearances.  Locate floor anchoring locations 
using provided drawings.

TABLE #1

Sample Bill of Material.

FIGURE #2

Rack Assembly Location and Anchor Bolt Pattern.

TABLE #2

Tourque Values.

Typical rack 

clearance, 2 min.

Typical aisle

clearance, 36

External rack dimensions.

See assembly drawings.

FIGURE #3

Placing

FIGURE #5

Installin

1

Initial Assembly

not supplied with 
(away from aisle) 
rack drawing for p
brace to brace co

ASSEMBLY INSTR

2

Side Rails:

Insta

See Figure #5. R

Place support rail
properly engaged

3

Installing Suppo

on 2-tier/2-row ra

RSO1942  2/18/03  4:06 PM  Page 2

Summary of Contents for L Series

Page 1: ...responsibility of the customer to secure racks in accordance with allowable floor loading applicable codes and regulations Grounding Rack grounding provisions are integrated into the base of each fram...

Page 2: ...ufacturers instructions for tools required to install floor anchoring hardware INSTALLATION DETAILS Bolted connection details are located at the end of installation manual for reference Torque values...

Page 3: ...support rail s in location using supplied 3 8 bolt lock washer and serrated strut nut Ensure that the strut nut has properly engaged the strut 3 Installing Support Rails Install support rails from th...

Page 4: ...ings 7 Battery Restraint Bracket Assembly Install the tie rods and covers of the battery restraint bracket assembly See Detail 4 If batteries are completely installed before this step installing tie r...

Page 5: ...en side restraint rails and covers to batteries If there is interference between battery and rail confirm that the battery is pushed to the back for single row and towards the center for double row ra...

Page 6: ...ll and inter unit connectors and cable assemblies as specified by the battery arrangement Refer to battery installation manual for more detail on battery connections ADDITIONAL INSTRUCTION FOR MULTI R...

Page 7: ...0 Frame Typical for Both Side Restraint and Bottom Rails Serrated Nut Strut For Support Rails or Side Rails Lock Washer 3 8 Bolt 3 8 16 x 1 00 Bolt 3 8 16 x 1 00 Note Bolt head must be facing Battery...

Page 8: ...rrated Strut Nut 5 16 18 Nut and 5 16 Lock Washer 3 8 16 x 1 00 Bolt and 3 8 lock washer DETAIL 5 End Restraint Assembly Detail 2022 C D Technologies Inc Any data descriptions or specifications presen...