![C&D Technologies L Series Assembly Instructions Manual Download Page 6](http://html1.mh-extra.com/html/candd-technologies/l-series/l-series_assembly-instructions-manual_3051840006.webp)
RS 1942
FIGURE #11
Completed Rack Assembly.
12
Install Front Cross Braces:
Install front cross braces for single row rack and front & rear cross braces for double
row racks. Note that the center bolt must be inserted into the brace from the battery side. If installed incorrectly the
bolt may puncture the battery container during a seismic occurrence. See Figure #11 Details #1 and #3.
13
Batterty Arrangement:
Install inter-cell and inter-unit connectors and cable assemblies as specified by the battery
arrangement. Refer to battery installation manual for more detail on battery connections.
ADDITIONAL INSTRUCTION FOR MULTI-RACK ARRANGEMENTS
Back to Back Assembly: Single row racks which are installed in an back to
back arrangement should be spaced a minimum of 2” apart.
Typical Bolted Connections:
Thes
Use torque values from Table #2. F
CONNECTION DETAILS FOR
Nut, 1/2-13
Frame, Typical for
Both Side Restraint
and Bottom Rails
Serrated Nut
Bolt, 3/8-16 x 1.00
Note: Bolt head must
be facing Battery
3/8 Lock washer
RSO1942 2/18/03 4:03 PM Page 1