UT10 Weather Station
UT10 tower
3/8-16 x 1.750 in bolt
mounting foot
concrete
3/8-16 x 2.000 in bolt
3/8-16 nut
UT10 connecting pipe
3.00 in ±.25 in
5/8 in nut
5/8 in flat washer
5/8 in split washer
5/8 in nuts
(leveling nuts)
5/8 in flat washer
FIGURE 2-6. UT10 Mounting Foot Detail View
6. Check the UT10 for plumb using a level and adjust the leveling nuts below
the mounting feet on the j-bolts as required. When the tower is plumb, use
two wrenches to lock the lower nuts on each j-bolt together. Tighten the
upper nuts to secure the base.
7. Removing the lower 3/8 in bolt on the rear (West) leg allows the tower to
be hinged to the ground. If a step ladder is available, it is easier to leave
the tower upright.
2.2 Sensor Mounting Brackets
Sensor mounting brackets provide a means of mounting the sensors to the
tower. General orientation of the mounting brackets is shown in FIGURE 2-7.
2.2.1 Crossarm Mounting
2.2.1.1 CM202, CM203, CM204, CM206 Crossarms
1.
Attach the crossarm at the desired height via the provided u-bolts and nuts
(FIGURE 2-8).
11