212 mm
140 mm
400 mm
3020 mm min. ÷ 4020 mm max.
P.
44
- M
an
ua
l c
od
e:
11
9
E
T
9
7
11
9
E
T
9
7
ver
.
33
0
5
/2
0
14 © C
A
M
E c
an
ce
lli a
ut
om
at
ic
i s
.p.
a.
- T
he d
at
a a
nd i
nf
or
m
at
io
n i
n t
hi
s m
an
ua
l m
ay b
e c
ha
ng
ed a
t a
ny t
im
e a
nd w
ith
ou
t o
bl
ig
at
io
n o
n t
he p
ar
t o
f C
am
e C
an
ce
lli A
ut
om
at
ic
i S
.p.
a.
t
o n
ot
if
y s
ai
d c
ha
ng
es
.
ENGLISH
5 Installation
Make sure you have all the tools and materials needed to carry out the installation in total safety and in accordance with current
regulations. The figure shows some examples of the tools needed by installers.
Before installing the operator, do the following:
• Check that the installing the operator does not create and hazardous situations;
Set up a suitable omnipolar cut-off device, with distances greater than 3 mm between contacts, with sectioned
power source;
• Set up proper conduits and electric cable raceways, making sure these are protected from any mechanical damage;
• Check that the anchoring point of the gearmotor is protected from any possible impacts, and that it is sturdy. Fasten using suitable
bolts plugs, etc. for the type of surface;
•
Check that any protection circuit connections (ground), inside the container, be properly insulated compared to the other
conductive parts;
• Make sure the door structure is sturdy enough, that the hinges are efficient and that there is no friction among the fixed and
moving parts.
Installation must be carried by skilled, qualified technicians in accordance with current regulations.
5.1 Preliminary checks
5.2 Tools and equipment
4.4 Dimensions
Summary of Contents for V900E
Page 3: ......
Page 27: ...INSTALLATION MANUAL V900E OPERATOR FOR OVERHEAD AND SECTIONAL DOORS English EN 119ET97EN ...
Page 29: ......
Page 55: ......
Page 81: ......