background image

Swing-gate operator

FROG PLUS

FROG-PM4

FROG-PM6

INSTALLATION MANUAL

FA01648-EN

EN

English

Summary of Contents for FROG-PM4

Page 1: ...Swing gate operator FROG PLUS FROG PM4 FROG PM6 INSTALLATION MANUAL FA01648 EN EN English ...

Page 2: ......

Page 3: ...atalogue or on the website www came com Make sure the mains power supply is disconnected during all installation procedures Check that the temperature ranges given are suitable for the installation site Do not install the operator on surfaces that could yield and bend If necessary add suitable reinforcements to the anchoring points Make sure that no direct jets of water can wet the product at the ...

Page 4: ...nised standards and the essential requirements of the Machinery Directive 2006 42 EC Any residual risks must be indicated clearly with proper signage affixed in visible areas and explained to end users Put the machine s ID plate in a visible place when the installation is complete If the power supply cable is damaged it must be immediately replaced by the manufacturer or by an authorised technical...

Page 5: ...0 kg in weight FROG PM6 Underground irreversible 230 V gearmotor with encoder and adjustable leaf stop during closing for swing gates with leaves up to 7 m in length and 550 kg in weight Intended use Concealed solution for use in residential and apartment block settings Any installation and or use other than that specified in this manual is forbidden Description of parts 1 Gearmotor 2 Movement tra...

Page 6: ...g 38 38 Cable types and minimum thicknesses Cable length m up to 20 from 20 to 30 Motor power supply 230 V AC 4G x 1 5 mm2 4G x 2 5 mm2 When operating at 230 V and outdoors use H05RN F cables compliant with 60245 IEC 57 IEC when operating indoors use H05VV F cables compliant with 60227 IEC 53 IEC For power supplies up to 48 V you can use FROR 20 22 II cables compliant with EN 50267 2 1 CEI If the ...

Page 7: ...nd the most suitable solution The drawings refer to the right side gearmotor Preliminary operations The preliminary operations for installation concern the foundation box installation and the release devices fastening Refer to the installation manuals for these products Setting up the gearmotor Insert the closing limit switch point adjustment screw into the gearmotor arm A Gearmotor installed on t...

Page 8: ...rmining the travel end points with mechanical limit switches Manually open the leaf to the desired point The leaf maximum opening is 110 Unscrew the opening limit switch point adjustment screw until it touches the foundation box Tighten the nut to lock the screw into position Close the gate manually Loosen the adjusting screw of the closing limit switch point until it touches the transmission leve...

Page 9: ...e control panel disconnect the mains power supply and remove the batteries if any Provide IP67 junction boxes with terminal blocks for connections 1 Blue cable 2 Brown cable 3 Black cable 4 Yellow green cable 5 Green cable 6 White cable A Power supply cable B Encoder cable L N Check the correct direction of rotation of the gearmotor and if necessary invert the connection of the brown and black cab...

Page 10: ...ation of the original instructions FINAL OPERATIONS OUTWARDS OPENING The only operation that is different from the standard installation is described below Setting up the gearmotor Insert the closing limit switch point adjustment screw into the gearmotor arm A Gearmotor installed on the left B Gearmotor installed on the right ...

Page 11: ...Page 11 Manual FA01648 EN 10 2021 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions ...

Page 12: ...ts of this manual may be changed at any time and without notice Translation of the original instructions AFFIX THE PRODUCT LABEL FROM THE BOX HERE CAME S p A Via Martiri della Libertà 15 31030 Dosson di Casier Treviso Italy Tel 39 0422 4940 Fax 39 0422 4941 ...

Reviews: