110
< 290
B
A
450
B
A
450
120°
P
ag
e 1
6 - M
an
u
al c
od
e:
11
9
D
V
3
9
E
N
11
9D
V
3
9E
N
ve
rs
.
5
0
5
/2
0
1
6 © C
A
M
E S
.p.
A
. - T
h
e d
ata a
n
d i
nf
or
m
ati
on p
rovi
d
ed i
n th
is m
an
u
al a
re s
u
b
je
ct to c
h
an
g
e at a
ny ti
m
e w
ith
ou
t p
rio
r n
ot
ic
e by C
A
M
E S
.p.
A
.
End run
Cams
Cam guide
UNI6957 Ø2.9X19 screw
Securing the brackets
N.B. the drawings refer to installation of the left-hand gearmotor. The installation of the right-hand gearmotor is symmetrical.
Determine the fixing point for the gate bracket and calculate the fixing point of the pillar bracket, respecting the values shown in the drawings and table.
Gate bracket
Pillar bracket
INSTALLING AND CONNECTIONS FOR OUTWARD-OPENINGS
Below are the only procedures that vary compared to standard installations:
⚠ Caution: if there are no end stops, end runs must be fitted.
Securing the end runs and determining the end run points
For left-hand gearmotor.
Secure the end run to the gearmotor and insert the cams on the guide.
Application size
Leaf opening
A
B
90°
150
0 120
120°
150
0 60