2
1
3
4
Pa
ge
20
-
M
anu
al
FA
01
23
7-
EN
- 0
7/
20
18 - © C
AM
E S
.p
.A
. - T
he c
on
te
nt
s o
f t
hi
s m
anu
al m
ay c
ha
ng
e, a
t a
ny t
im
e, a
nd wi
th
ou
t n
ot
ic
e.
-
Or
igin
al
in
st
ru
ct
io
ns
FINAL
OPERATIONS
When you have completed the electrical connections and setting up, fit the control panel cover,replace the inspection hatch
. Lock the hatch by
using the key
.
⚠
WARNING! This operation is potentially hazardous for users, when for whatever reason, such as the boom being
badly fastened, ripped out or broken during an accident, and so on, the loosened springs no longer provide the
proper balancing action. This could lead to a sudden rotation of the boom attachment and/or of the boom itself.
RELEASING
THE
BOOM
⚠
This procedure must be done with the mains power cut off.
Fit the key into the lock and turn it clockwise
. Manually raise the boom and lock it back into place by turning the key
counter clockwise
.