1
2
Pa
ge
7
-
M
anu
al
FA
01
23
7-
EN
- 0
7/
20
18 - © C
AM
E S
.p
.A
. - T
he c
on
te
nt
s o
f t
hi
s m
anu
al m
ay c
ha
ng
e, a
t a
ny t
im
e, a
nd wi
th
ou
t n
ot
ic
e.
-
Or
igin
al
in
st
ru
ct
io
ns
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts.
Fit the electric cables into the tubes so that they come out about 600 mm.
Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Fastening the barrier
Fit the customized key into the lock and turn it counter-clockwise
. Remove the inspection hatch from the cabinet
.