Step 2: Door arm installation

 

Figure 3 

After you're satisfied with testing the arm in the full open and closed positions, weld gate 

bracket and arm

.

Figure 4 

A.  Should be at least 1/4 the gate length. NOTE: Uphill or heavy gates should be at least 1/3 gate 

length. 

B.  14

 minimum for open gate clearance (2" thick gate) 

C.  27

"

D&E

.

 

 

Arm should be 90° from gate when open and in the straight "locked".

 

D=

L

*0.6,

 

E=

L

*0.4 

Installation

5

Summary of Contents for CM7-DCFP

Page 1: ...www calimetco com 9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Swing Gate Operator 24V Battery Backup CM7 DCFP Instruction Manual...

Page 2: ...y maintained Read the owner s manual on how to maintain your gate Have a certified service technician make repairs or install gate operator hardware The gate entrance should be used for vehicles only...

Page 3: ...tes Primary Device A B1 B2 D Secondary Device one required A B1 B2 D E Swing Gates Primary Device A B1 B2 C D Secondary Device one required A B1 B2 C D E REQUIRED ENTRAPMENT PROTECTION A Inherent buil...

Page 4: ...gate while operating the controls Controls intended to be used to reset an operator after 2 sequential activations of the entrapment protection device or devices must be located in the line of sight...

Page 5: ...e 2 Wedge Anchor Step 1 Installing the Base The base also known as a pad is a raised platform We recommend using a concrete base 1 2 x 3 1 2 4 Contact local underground utility locating companies befo...

Page 6: ...sed positions weld gate bracket and arm Figure 4 A Should be at least 1 4 the gate length NOTE Uphill or heavy gates should be at least 1 3 gate length B 14 minimum for open gate clearance 2 thick gat...

Page 7: ...h stress is put on the arm in this position during gate operation Figure 6 A Preferred arm position is 90 from the open gate B Distance between door and machine 2 min Installation Figure 5 C 6 NOTE If...

Page 8: ...Figure 7 Support bar should be installed at the gate bracket height across the entire gate to keep the gate pickets from bending Installation 7...

Page 9: ...nimum capacity for 15 amp current 2 All operators MUST be properly grounded in order to prevent an electrical charge Must use a dedicated circuit for power supply 3 When the power is connected turn op...

Page 10: ...board 3 Mount the photo eye on the stationary part of your gate or a post next to your gate about 21 from the ground 4 Press the orange button on the photo eye to turn on the infrared beam 5 Mount the...

Page 11: ...ft or right on both limit cams to adjust the position of where the gate opens and closes Figure 9 TIP Use the OPEN CLOSE STOP buttons on the gate operator circuit board for faster testing 3 Use the sc...

Page 12: ...Reset the pedal only when the operator doesn t work while using the remote control 1 Push the pedal downward from locked position and slightly move to the left 2 Allow the pedal rise up to the reset p...

Page 13: ...Figure 15 Features Safety and Exit Loop This is an optional step If you wish to install a exit loop detector see figure 15 for the position of the safety and exit loops Entrapment Protection 12...

Page 14: ...e bottom of the circuit board with the words DATA and DATA B Use a flathead screwdriver to release the 2 locks on the top of the green terminal C For conductor 1 connect the DATA on the MASTER circuit...

Page 15: ...Figure 16 Features Control Board Layout This is a picture of the control board Use this for reference Youtube Circuit board Programming Guide https youtu be _7iBuKr1ZtY 13...

Page 16: ...on B Unscrew the back of the remote control to gain access to the control board You should see 1 8 dip switches Each switch has 3 positions up middle bottom Flip these 1 8 switches to any position you...

Page 17: ...1 60 seconds 3 OSC Remote control priority Allow remote control to direct gate movement whenever gate is moving in any direction Use first signal to stop gate use second signal to move gate to opposi...

Page 18: ...Figure 20 16 Features Installing an External Receiver External connectors are installed on the rear side of mainboard protector box...

Page 19: ...er opening it Figure 24 Figure25 Figure 22 Test ERD every 6 months Electronic Reversing Device ERD The Electronic Reversing Device ERD is a feature on the circuit board which detects when the gates co...

Page 20: ...when STAND BY OFF when the STOP input is activated or foot pedal is pressed down 3 SATETY ON when Stand By OFF when SAFETY LOOP input is activated 4 PHANTOM ON when incoming signal is detected 5 EXIT...

Page 21: ...tive 13 TIMER Blinks when TIMER is counting down to close automatically 14 OPENING ON when gate is in the open cycle 15 CLOSEING ON when gate is in the close cycle 16 MON FAULT ON when photo eye has m...

Page 22: ...9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Alternate 626 482 3066 Fax 626 452 9010 Email info calimetco com www calimetco com...

Reviews: