MN260 B | 41
Service Manual
7.8.4 BATTERY CABLE INSTALLATION
7.8.4.1 Secure two Cable Ties through the holes in LEFT STRUT (9779-SEQ) and round all wires.
Secure two Cable Ties around all wires (battery cables & ATF Bundle).
Apply one Cable Tie around all battery cables, close to the battery board, as in Figure below.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
NOTE: Ensure slack to wires where indicated.
Orient the Cable Tie knots towards the Compressor.
ATF wires
go through slot
cable ties (6968-SEQ)
through STRUT holes
cable ties (6968-SEQ)
secure all cables
Figure 7-52. Cable Tie Knots
7.8.4.2 Wrap the Wire Sleeve around the ATF wires and pass thru the Bulkhead.
Pass the two Battery wires from the Battery Connector thru the Bulkhead as shown in figure below.
battery
connector
cable (21494875)
ATF power &
ATF thermistor
wires
3” wire sleeve
(9638-SEQ)
Figure 7-53. Wire Sleeve
Summary of Contents for SAROS 4000
Page 56: ...Service Manual 56 MN260 B NOTES ...