
WPIM-DI Configuration
WPIM-DI Local Management Guide
2-11
You can assign WAN application ports to the 24 interfaces for the PPP
configuration that suits your needs. In a Frame Relay configuration, you
can assign all WAN application ports to one interface. In this example, the
remaining 23 interfaces would not have WAN application ports available.
The quantity of application ports for a Frame Relay network is
determined by the quantity of DLCIs assigned to that Interface. This is
determined either manually or by the Link Management Protocol (LMP).
IF#
Displays the Interface that is associated with the application port.
LID
Displays the Link Identifier. If the active protocol is Frame Relay, the
Data Link Connection Identifier is displayed. If the active protocol for
this interface is PPP, then PPP appears in this field.
STATE
Displays the status of the application port. If the active protocol is Frame
Relay, this field displays the status as Active, Inactive, or Disabled (for no
LMI). If the active protocol is PPP, this field displays UP (for active) or
DOWN (for inactive).
2.3
WPIM-DI CONFIGURATION
This section provides step-by-step instructions for configuring the
WPIM-DI to use a full or fractional T-1 circuit in a PPP or Frame Relay
environment. This simplified example assumes the setup shown in
Figure 2-7 using two CSX400s containing a WPIM-DI at Site #1 and a
WPIM-T1 at Site #2. Configurations may vary depending on the hub.
Figure 2-7
Full T-1 Configuration
SITE #1
Telco Cloud
24 Timeslots
24 Timeslots
SITE #2
1482_05