TESTING AND TROUBLESHOOTING
4-3
LAN-MD 1 now acts as the SERVER unit and will
echo packets when used with the other LAN-MD.
5.
Select and run test 4, NODE, on the LAN-MD
connected in step 2.
Verify that the NODE test passes. At least 100 packets
should be sent and received with no errors. The
packets will be received and sent back from the
SERVER LAN-MD that was left running on the other
segment.
When the TPT has passed the NODE test, it is ready for
normal operation. If any failures are noted, please contact
Cabletron Systems’ Technical Support.
4.2
USING LANVIEW
The TPT Twisted Pair Transceiver uses Cabletron
Systems’ built-in diagnostic and status monitoring
system, LANVIEW. The LANVIEW LEDs give you a
visual indication of network activity and can help you
isolate problems.
The following explains the purpose of each LANVIEW
LED.
Summary of Contents for TPT
Page 2: ......