2050
User Guide
Figure 4: 6ft Serial Cable
C&C P/N
4250003-6
Note –
Pin 5 should connect to shield of cable at both ends.
Indicator Panel
Figure 5: 2050 Indicator Panel
The Indicator Panel provides the on/off (I/O) switch
and a quick view of the status of the
2050
GPS
sensor, corrections source & type, and StarFire
signal strength. Each of the
three indicators has three LEDs, which depict status as detailed in the following tables.
To power the unit on or off, the on/off (I/O) switch must be depressed for more than 3
seconds. During power up of the
GPS
sensor, all LEDs will be on for a period of 3-5
seconds.
2-10
Summary of Contents for 2050
Page 2: ...1 2 ...
Page 8: ......
Page 14: ...2050 User Guide This Page Intentionally left blank 6 ...
Page 17: ...2050 User Guide Figure 2 2050 Front View Figure 3 2050M Only Back View 2 9 ...
Page 22: ...2050 User Guide This Page Intentionally left blank 2 14 ...
Page 34: ...2050 User Guide This Page Intentionally left blank A 26 ...
Page 42: ...2050 User Guide This Page Intentionally left blank C 34 ...
Page 43: ...2050 User Guide C 35 ...
Page 44: ...2050 User Guide This Page Intentionally left blank C 36 ...
Page 58: ...2050 User Guide This Page Intentionally left blank C 50 ...
Page 60: ...2050 User Guide This Page Intentionally left blank C 52 ...
Page 62: ...2050 User Guide C 54 ...
Page 64: ...2050 User Guide C 56 ...
Page 65: ...2050 User Guide C 57 ...