![BYD HVM 11.0 Operating Manual Download Page 30](http://html1.mh-extra.com/html/byd/hvm-11-0/hvm-11-0_operating-manual_2836990030.webp)
Shenzhen BYD Electronic Co., LTD
6 Electrical Connection
29
HVS&HVM Operating Manual
Additionally required material (not included in the scope of delivery):
•
One to two data cables
Data cable requirements:
The cable length and quality affect the quality of the signal. Observe the following cable
requirements.
•
Cable category: Cat5, Cat5e or higher
•
Plug type: Metal shielded RJ45 of Cat5, Cat5e or higher
•
Shielding: Yes
•
UV-resistant for outdoor use
•
Straight- through wired cables
•
Maximum cable length: 20 m.
Procedure:
1.
Take off the nut of the cable gland b.
2.
Take the cable support sleeve inside of the cable
gland.
3.
Take out the plug and get the data cable inside of the cable support sleeve. IF ONLY ONE
HOLE OF THE CABLE GLAND B IS USED, PLEASE MAKE SURE THE OTHER HOLE IS WELL
COVERED BY THE PLUG BEFORE FINISHING THE INSTALLATION. OTHERWISE, THE
WATER HAS THE POSSIBILITY TO GET INSIDE OF BCU.
4.
Lead the data cable through cable gland b.
5.
Plug the cable to the corresponding RJ45 port.
6.
Swipe the dip switch (Parallel) according to the drawing.
1
2
Summary of Contents for HVM 11.0
Page 1: ......