5 Installation
Shenzhen BYD Electronic Co., LTD
20
HVS&HVM Operating Manual
7.
Install the hanger (BCU part) to the BCU. To do this, insert
the screws (M5x14) through the hole on the BCU using a
cylinder screwdriver (8 mm) and tighten them (torque: 5.5
Nm).
8.
Put the BCU on top of the battery modules.
Recommend to connect cables on the BCU first when five
or more than five battery modules are needed to be
installed in one tower.
9.
Fix the connection between the battery module and the
base, between battery modules, and between BCU and
battery module. To do this, insert the screws (M4x14)
through the holes on them, using a Phillips screwdriver
(PH2) and tighten them (torque: 2 Nm).
10.
Hold the hanger (wall part) where it intends to be mounted
on the wall and mark the position of the drill holes. Please
pay attention that there may be power cables or other
supply lines (e.g., gas or water) routed in the wall. Ensure
that no lines are laid in the wall, which could be damaged
when drilling holes.
11.
Set the hanger aside and drill the marked holes.
12.
Insert screw anchors into the drill holes if the support
surface requires them.
13.
Secure the hanger using screws (recommended M8x40).
14.
Fix the two hangers (wall part and BCU part) with M6X16
bolts and nuts, using a cylinder screwdriver (10 mm) to
tighten it (torque: 8 Nm).
15.
Mark the product type.
D G
A
8mm
5.5Nm
J
P 2
H
2Nm
L
HVS XX
NOTICE
Damage to the
battery
system due to
under voltages
•
I
f the battery is installed, it should be set into operation
w
ithin a month, or chec
k
ed
regularly, other
w
ise there might be damage to the batteries.