
8
Operation
27
8.
Operation
8.1.
Switch on the Battery System
To make sure the battery system can work well with the inverter, please follow the right procedure to
start them.
The procedure is:
1) turn on the switch between the inverter and battery if there is any;
2) switch on the battery system;
3) switch on the inverter.
Shen
z
hen BYD Electronic Co.
,
L
TD