
5
Installation
16
5.2.2.
Installed in a Rack or Cabinet
Additionally required mounting material (not included in the scope of delivery):
Rack or cabinet and related screws.
Procedure:
1.
Put the modules into the dedicated positions.
2.
Insert the screws and fasten the modules to the rack or cabinet.
Shen
z
hen BYD Electronic Co.
,
L
TD