
5
Installation
15
3.
Install the four alignment pins.
4.
Put another module on top of the previous module.
5.
Shen
z
hen BYD Electronic Co.
,
L
TD
Install the bonding strips to fix the modules together.
(torque, 3±0.5 N
·
m)
Procedure:
1. Take the module out of the package.
2. Install four adjustable leveling feet.