
6
Electrical Connection
18
6.2.
Connection Diagram
The connection to Ethernet cable is recommended, not compulsory.
6.3.
Connecting the PE
Shen
z
hen BYD Electronic Co.
,
L
TD
Additionally required mounting material (not included in the scope of delivery):
PE with Terminal
PE and Terminal Requirement
a) Terminal, 5mm.
b) Minimum terminal cross-section: 10 mm²
c) The cross-section of the grounding terminal must comply with the locally applicable standards
and directives
d) PE
Material: Copper wire
Procedure:
1. Make sure the modules are switched
off.
2.
Take
out the grounding screw, and get the PE conductor through it.
3. Fix them together,
with a cylinder screwdriver 8 mm, and tighten it (torque, 4 N
·
m).