2019/08 - Indice de révision : D - Code : 29650
TRAITEMENT DE L'EAU
49/72
•
Cut another piece of tube to the required length - this will become the suction tube. Attach one end to the
acid pump inlet (left side).
•
Thread the other end of the tube through the lid of the acid tank, atttach it to the ballast weight and strainer.
•
Close the lid of the acid tank and make sure the suction tube cannot be pulled out of the tank.
•
Place the acid tank inside a spill containment vessel (a basin to hold acid in case of overflow or tipping of
the acid tank).
•
Turn the control box on. Run the acid pump in MANUAL mode for a few minutes.
•
Make sure the red light on the pump is energised, that it is running and that acid is being sucked from the
acid container and expelled through the injection tube.
4.5.4
When starting up for the first time
•
run the acid dosing pump in MANUAL mode until the pump is primed.
•
Check the entire circuit for leaks
from suction from the tank to injection into the pool's hydraulic
circuit.
4.6
Installing the sensors
The sensors are mounted on the same tee, diameter 63 mm.
4.6.1 The REDOX sensor
After removing the pliable protective cap (which should be kept to winterize the sensor), insert the threaded
end of the sensor into the tapped port taking care not to twist the filament, use Teflon and tighten the
sensor to achieve a leaktight seal.