OPERA
TION
4815/4810/14815/14810 12/21 Operation Section 4-2
© 2021 Alamo Group Inc.
OPERATION
BUSH HOG 4815/14815/4810/14810 ROTARY MOWER
OPERATION INSTRUCTIONS
Bush Hog rotary mowers are manufactured with quality material by skilled workers. These mowers are
designed to cut grass, weeds, small brush and other vegetative material up to 4-1/2” diameter in areas such as
pastures and along highway right-of-ways. The mower is equipped with protective deflectors and/or chain
guards to prevent objects being thrown from the mower by the blades, however, no shielding is 100% effective.
All shields, guards, deflectors,and chains equipped on the unit must be maintained on the mower in good
operational condition.
It is the operator’s responsibility to be knowledgeable of all potential operating hazards and to take every
reasonable precaution to ensure oneself, others, animals, and property are not injured or damaged by the
mower, tractor, or a thrown object. Do not operate the mower if passersby, pets, livestock, or property are
within 300 feet of the unit unless:
•
All THROWN OBJECT SHIELDING
including, Front and Rear Deflectors, Chains Guards, Steel Guards,
Bands, Side Skirts and Skid Shoes in place and in good condition when mowing.
•
MOWER SECTIONS OR WING
are adjusted to be close and parallel to ground without exposing blades.
•
MOWING AREA
has been inspected and foreign materials and debris have been removed.
•
PASSERSBY
are inside enclosed vehicle.
This section of the Operator’s Manual is designed to familiarize, instruct, and educate safe and proper mower
use to the operator. Pictures contained in this section are intended to be used as a visual aid to assist in
explaining the operation of a rotary mower. Some pictures may show shields removed for purposes of clarity.
NEVER OPERATE this implement without all shields in place and in good operational condition. The operator
must be familiar with the mower and tractor operation and all associated safety practices before operating the
mower and tractor. Proper operation of the mower, as detailed in this manual, will help ensure years of safe
and satisfactory use of the mower
IMPORTANT:
To avoid mower damage, retorque all bolts after the first 10 hours of operation. Re-tighten blade
carrier retaining nut on gearbox lower shafts to 450 ft. lbs.
READ AND UNDERSTAND THE ENTIRE OPERATING INSTRUCTIONS AND SAFETY SECTION OF THIS
MANUAL AND THE TRACTOR MANUAL BEFORE ATTEMPTING TO USE THE TRACTOR AND
IMPLEMENT.
If you do not understand any of the instructions, contact your nearest authorized dealer for a
full explanation. Pay close attention to all safety signs and safety messages contained in this manual and
those affixed to the implement and tractor.
OPS-U- 0001
READ, UNDERSTAND, and FOLLOW the following Safety Messages. Death or serious
injury may occur unless care is taken to follow the warnings and instructions stated in the
Safety Messages. Always use good common sense to avoid hazards.
(SG-2)
Si no lee ingles, pida ayuda a alguien que si lo lea para que le traduzca las
medidas de seguridad.
(SG-3)
Summary of Contents for 14810RR1
Page 3: ......
Page 4: ......
Page 9: ...SAFETY SECTION Safety Section 1 1...
Page 23: ...SAFETY SAFETY 4815 4810 14815 14810 12 21 Safety Section 1 15 2021 Alamo Group Inc...
Page 31: ...SAFETY SAFETY 4815 4810 14815 14810 12 21 Safety Section 1 23 2021 Alamo Group Inc...
Page 35: ...SAFETY 4815 4810 14815 14810 12 21 Safety Section 1 27 2021 Alamo Group Inc SAFETY...
Page 36: ......
Page 62: ......
Page 88: ......
Page 89: ...INTRODUCTION SECTION Introduction Section 2 1...
Page 95: ...ASSEMBLY SECTION Assembly Section 3 1...
Page 96: ...ASSEMBLY ASSEMBLY 4815 4810 14815 14810 12 21 Assembly Section 3 2 2021 Alamo Group Inc...
Page 98: ...ASSEMBLY 4815 4810 14815 14810 12 21 Assembly Section 3 4 2021 Alamo Group Inc ASSEMBLY...
Page 99: ...ASSEMBLY ASSEMBLY 4815 4810 14815 14810 12 21 Assembly Section 3 5 2021 Alamo Group Inc...
Page 100: ...ASSEMBLY ASSEMBLY 4815 4810 14815 14810 12 21 Assembly Section 3 6 2021 Alamo Group Inc...
Page 103: ...ASSEMBLY ASSEMBLY 4815 4810 14815 14810 12 21 Assembly Section 3 9 2021 Alamo Group Inc...
Page 105: ...OPERATION SECTION Introduction Section 4 1...
Page 111: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 7 2021 Alamo Group Inc...
Page 112: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 8 2021 Alamo Group Inc OPERATION...
Page 114: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 10 2021 Alamo Group Inc...
Page 115: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 11 2021 Alamo Group Inc...
Page 116: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 12 2021 Alamo Group Inc OPERATION...
Page 117: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 13 2021 Alamo Group Inc...
Page 119: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 15 2021 Alamo Group Inc...
Page 120: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 16 2021 Alamo Group Inc...
Page 121: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 17 2021 Alamo Group Inc...
Page 122: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 18 2021 Alamo Group Inc...
Page 123: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 19 2021 Alamo Group Inc OPERATION...
Page 124: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 20 2021 Alamo Group Inc OPERATION...
Page 125: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 21 2021 Alamo Group Inc...
Page 126: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 22 2021 Alamo Group Inc OPERATION...
Page 127: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 23 2021 Alamo Group Inc OPERATION...
Page 128: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 24 2021 Alamo Group Inc OPERATION...
Page 129: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 25 2021 Alamo Group Inc...
Page 130: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 26 2021 Alamo Group Inc...
Page 131: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 27 2021 Alamo Group Inc...
Page 133: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 29 2021 Alamo Group Inc OPERATION...
Page 134: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 30 2021 Alamo Group Inc OPERATION...
Page 135: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 31 2021 Alamo Group Inc...
Page 136: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 32 2021 Alamo Group Inc OPERATION...
Page 137: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 33 2021 Alamo Group Inc...
Page 138: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 34 2021 Alamo Group Inc...
Page 140: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 36 2021 Alamo Group Inc...
Page 141: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 37 2021 Alamo Group Inc OPERATION...
Page 142: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 38 2021 Alamo Group Inc...
Page 144: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 40 2021 Alamo Group Inc...
Page 145: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 41 2021 Alamo Group Inc...
Page 146: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 42 2021 Alamo Group Inc OPERATION...
Page 147: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 43 2021 Alamo Group Inc...
Page 148: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 44 2021 Alamo Group Inc...
Page 149: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 45 2021 Alamo Group Inc OPERATION...
Page 150: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 46 2021 Alamo Group Inc...
Page 151: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 47 2021 Alamo Group Inc OPERATION...
Page 152: ...OPERATION OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 48 2021 Alamo Group Inc...
Page 154: ...OPERATION 4815 4810 14815 14810 12 21 Operation Section 4 50 2021 Alamo Group Inc OPERATION...
Page 155: ...MAINTENANCE SECTION Maintenance Section 5 1...
Page 173: ......
Page 174: ...Secci n de Seguridad 1 29 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc SEGURIDAD...
Page 175: ...Secci n de Seguridad 1 28 SEGURIDAD SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 176: ...SEGURIDAD Secci n de Seguridad 1 27 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 177: ...SEGURIDAD Secci n de Seguridad 1 26 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 178: ...SEGURIDAD Secci n de Seguridad 1 25 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 180: ...SEGURIDAD Secci n de Seguridad 1 23 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 181: ...SEGURIDAD Secci n de Seguridad 1 22 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 182: ...SEGURIDAD Secci n de Seguridad 1 21 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 183: ...SEGURIDAD Secci n de Seguridad 1 20 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 184: ...SEGURIDAD Secci n de Seguridad 1 19 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 185: ...SEGURIDAD Secci n de Seguridad 1 18 SEGURIDAD 4815 4810 14815 14810 12 21 2021 Alamo Group Inc...
Page 202: ...Secci n de Seguridad 1 1 2018 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 203: ......
Page 206: ......
Page 207: ...Placa de N mero de serie...