1
Figure 22: Securing Draft Hood to Canopy
A.
Remove crate
and move boiler to permanent position
as detailed in Section III: Semi-Pak Boiler Assembly.
B.
Remove Jacket Front Panel.
See Figure 50.
C.
Remove poly bag
from vestibule area.
D.
On Steam Boilers with probe low water cutoff
the
L404 pressure limit/control has been packed in the
vestibule area.
1. Screw the pressure limit/control onto the syphon.
DO NOT TWIST CONTROL. Use wrench on hex
fitting at bottom of control. See Figures 18A or
18B.
2. Snap the electrical conduit from the adjacent
junction box into the hole in the control.
3. Open the control's clear cover and attach the two (2)
wires in the conduit to the two (2) unused screw
terminals.
IV. Packaged Boiler Assembly
Figure 21: Draft Hood Attachment
E.
Install Jacket Front Panel.
F.
Install Draft Hood
. Models IN3 through IN9.
1. Locate and open "Rear Draft Hood Carton".
2. Position Draft Hood on Canopy Rear Flange. See
Figure 21. Top canopy flange must fully engage
"U"-shaped draft hood flange for proper installation
and operation. Care must be taken to assure that
draft hood is level.
3. Secure Rear Draft Hood to Canopy with wing nuts
provided. See Figure 22.
G
N
I
N
R
A
W
e
b
d
l
u
o
h
s
r
e
li
o
b
s
i
h
t
f
o
n
o
i
t
a
ll
a
t
s
n
I
d
e
ll
i
k
s
d
n
a
d
e
n
i
a
r
t
y
b
y
l
n
o
n
e
k
a
t
r
e
d
n
u
.
y
c
n
e
g
a
e
c
i
v
r
e
s
d
e
i
f
il
a
u
q
a
m
o
r
f
l
e
n
n
o
s
r
e
p
G
N
I
N
R
A
W
y
n
a
e
c
a
l
p
r
o
d
o
o
h
t
f
a
r
d
r
e
li
o
b
r
e
t
l
a
t
o
n
o
D
e
h
t
n
i
r
e
p
m
a
d
d
e
v
o
r
p
p
a
-
n
o
n
r
o
n
o
i
t
c
u
r
t
s
b
o
e
g
a
ll
i
p
s
s
a
g
e
u
l
F
.
m
e
t
s
y
s
t
n
e
v
r
o
g
n
i
h
c
e
e
r
b
ll
i
w
n
o
i
t
a
c
i
f
i
t
r
e
c
C
L
T
E
/
L
T
E
.
r
u
c
c
o
n
a
c
.
d
i
o
v
e
m
o
c
e
b
Summary of Contents for Independence
Page 4: ... Figure 1 Dimensional Drawing ...
Page 19: ...19 Figure 25 Recommended Water Piping for Circulator Zoned Heating System ...
Page 20: ...20 Figure 25A Recommended Water Piping for Zone Valve Zoned Heating System ...
Page 29: ...29 Figure 34 Vent Damper Schematic Wiring Diagram Figure 33 Vent Damper Harness to Limit ...
Page 30: ...30 Figure 35 Wiring Diagrams Steam Continuous Ignition Standing Pilot Probe Low Water Cutoff ...
Page 32: ...32 Figure 36 Wiring Diagrams Steam Intermittent Ignition EI Probe Low Water Cutoff ...
Page 34: ...34 Figure 37 Wiring Diagrams Steam Intermittent Ignition HSP Probe Low Water Cutoff ...
Page 36: ...36 Figure 38 Wiring Diagrams Steam Continuous Ignition Standing Pilot Float Low Water Cutoff ...
Page 38: ...38 Figure 39 Wiring Diagrams Steam Intermittent Ignition EI Float Low Water Cutoff ...
Page 40: ...40 Figure 40 Wiring Diagrams Steam Intermittent Ignition HSP Float Low Water Cutoff ...
Page 44: ...44 Figure 42 Wiring Diagrams Water Intermittent Ignition EI Intermittent Circulation ...
Page 46: ...46 Figure 43 Wiring Diagrams Water Intermittent Ignition HSP Intermittent Circulation ...
Page 48: ...48 Figure 44 Wiring Diagrams Water Continuous Ignition Standing Pilot Gravity Circulation ...
Page 50: ...50 Figure 45 Wiring Diagrams Water Intermittent Ignition EI Gravity Circulation ...
Page 52: ...52 Figure 46 Wiring Diagrams Water Intermittent Ignition HSP Gravity Circulation ...
Page 54: ...54 Figure 47 Wiring Diagrams Water Continuous Ignition Standing Pilot Tankless Heater ...
Page 56: ...56 Figure 48 Wiring Diagrams Water Intermittent Ignition EI Tankless Heater ...
Page 58: ...58 Figure 49 Wiring Diagrams Water Intermittent Ignition HSP Tankless Heater ...
Page 61: ...61 Figure 53 Lighting Instructions Continuous Ignition System VR8200 and VR8300 Gas Valves ...
Page 62: ...62 Figure 54 Lighting Instructions Continuous Ignition System 7000 ERHC Gas Valve ...
Page 65: ...65 Figure 57 Operating Instructions Intermittent Ignition System HSP SV9501 and SV9601 ...
Page 76: ...76 ...
Page 77: ...77 Honeywell Hot Surface to Pilot Trouble Shooting Guide ...
Page 91: ...91 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 92: ...92 ...
Page 96: ...96 ...
Page 99: ...99 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 100: ...100 ...