
9
Figure 4: Base Gasket Installation
II. Knocked-Down Boiler Assembly
G
N
I
N
R
A
W
e
b
d
l
u
o
h
s
r
e
li
o
b
s
i
h
t
f
o
n
o
i
t
a
ll
a
t
s
n
I
d
e
ll
i
k
s
d
n
a
d
e
n
i
a
r
t
y
b
y
l
n
o
n
e
k
a
t
r
e
d
n
u
.
y
c
n
e
g
a
e
c
i
v
r
e
s
d
e
i
f
il
a
u
q
a
m
o
r
f
l
e
n
n
o
s
r
e
p
A.
Install Base-Burner-Manifold Assembly
1. Base-Burner-Manifold is shipped assembled from
factory (Gas Valve and Pilot/Burner Assembly is
shipped in the "Gas Controls Carton").
2. Unpack base assembly and place in location where
boiler is to be installed (Refer to Section I: Pre-
Installation).
B.
Install assembled cast iron sections
on base assembly:
1. Install (4) 5/16" x ¼" self-tapping screws through
(4) holes in upper base flange with screw heads on
underside of flange. Note: Screws are located in
fiber gasket parts bag.
2. Install ceramic fiber gasket. See Figure 4.
3. Position boiler above base with lugs cast in boiler
sections centered over screws protruding from top of
base. Lower boiler onto base taking care not to
disturb ceramic fiber gasket. Secure with 5/16"
locknuts and washers provided. See Figure 5.
Figure : Section Assembly Attachment
4. Loosen nuts on tie rods until only finger tight.
5. If Steam boiler or Water boiler less tankless heater,
proceed to Step C.
6. Water Boiler with tankless heater. Remove heater
opening cover plate and install tankless heater as
follows:
a. Place rubber gasket over heater coil and against
heater plate. Align holes in plate and gasket.
b. Install water heater coil through opening into top
nipple ports of boiler and fasten with 3/8" hex
head machine screws and flat washers.
Note: If tankless heater is not installed, heater
opening cover plate must remain in place.
C.
Test boiler for leaks
before connecting to system and
installing controls, trim and jacket.
1. Attach pressure gauge (capable of indicating 30 psi)
on boiler.
2. Attach fill valve and piping to return tapping and
purge valve to supply tapping. See Figure 6.
Figure : Hydrostatic Pressure Test
3. Install plugs in remaining tappings.
4. Fill boiler completely with water by venting air
through purge valve. Close purge valve and apply
water pressure of at least 10 psi but not exceeding
30 psi gauge pressure.
5. Examine boiler carefully inside and outside for leaks
or damage due to shipment or handling.
Summary of Contents for Independence
Page 4: ... Figure 1 Dimensional Drawing ...
Page 19: ...19 Figure 25 Recommended Water Piping for Circulator Zoned Heating System ...
Page 20: ...20 Figure 25A Recommended Water Piping for Zone Valve Zoned Heating System ...
Page 29: ...29 Figure 34 Vent Damper Schematic Wiring Diagram Figure 33 Vent Damper Harness to Limit ...
Page 30: ...30 Figure 35 Wiring Diagrams Steam Continuous Ignition Standing Pilot Probe Low Water Cutoff ...
Page 32: ...32 Figure 36 Wiring Diagrams Steam Intermittent Ignition EI Probe Low Water Cutoff ...
Page 34: ...34 Figure 37 Wiring Diagrams Steam Intermittent Ignition HSP Probe Low Water Cutoff ...
Page 36: ...36 Figure 38 Wiring Diagrams Steam Continuous Ignition Standing Pilot Float Low Water Cutoff ...
Page 38: ...38 Figure 39 Wiring Diagrams Steam Intermittent Ignition EI Float Low Water Cutoff ...
Page 40: ...40 Figure 40 Wiring Diagrams Steam Intermittent Ignition HSP Float Low Water Cutoff ...
Page 44: ...44 Figure 42 Wiring Diagrams Water Intermittent Ignition EI Intermittent Circulation ...
Page 46: ...46 Figure 43 Wiring Diagrams Water Intermittent Ignition HSP Intermittent Circulation ...
Page 48: ...48 Figure 44 Wiring Diagrams Water Continuous Ignition Standing Pilot Gravity Circulation ...
Page 50: ...50 Figure 45 Wiring Diagrams Water Intermittent Ignition EI Gravity Circulation ...
Page 52: ...52 Figure 46 Wiring Diagrams Water Intermittent Ignition HSP Gravity Circulation ...
Page 54: ...54 Figure 47 Wiring Diagrams Water Continuous Ignition Standing Pilot Tankless Heater ...
Page 56: ...56 Figure 48 Wiring Diagrams Water Intermittent Ignition EI Tankless Heater ...
Page 58: ...58 Figure 49 Wiring Diagrams Water Intermittent Ignition HSP Tankless Heater ...
Page 61: ...61 Figure 53 Lighting Instructions Continuous Ignition System VR8200 and VR8300 Gas Valves ...
Page 62: ...62 Figure 54 Lighting Instructions Continuous Ignition System 7000 ERHC Gas Valve ...
Page 65: ...65 Figure 57 Operating Instructions Intermittent Ignition System HSP SV9501 and SV9601 ...
Page 76: ...76 ...
Page 77: ...77 Honeywell Hot Surface to Pilot Trouble Shooting Guide ...
Page 91: ...91 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 92: ...92 ...
Page 96: ...96 ...
Page 99: ...99 THIS PAGE LEFT BLANK INTENTIONALLY ...
Page 100: ...100 ...