![Burnham 2PV Series Installation, Operating And Service Instructions Download Page 9](http://html1.mh-extra.com/html/burnham/2pv-series/2pv-series_installation-operating-and-service-instructions_2832901009.webp)
9
Table 2: Maximum Capacity of Schedule 40 Pipe in CFH For Gas Pressures of 0.5 psig or Less
Table 3: Fitting Equivalent Lengths
Table 4: Specifi c Gravity Correction Factors
h
t
g
n
e
L
]
t
e
e
F
[
p
o
r
D
e
r
u
s
s
e
r
P
.
c
.
w
h
c
n
i
3
.
0
p
o
r
D
e
r
u
s
s
e
r
P
.
c
.
w
h
c
n
i
5
.
0
½
¾
1
¼
1
½
¾
1
¼
1
0
1
2
3
1
8
7
2
0
2
5
0
5
0
,
1
5
7
1
0
6
3
0
8
6
0
0
4
,
1
0
2
2
9
0
9
1
0
5
3
0
3
7
0
2
1
0
5
2
5
6
4
0
5
9
0
3
3
7
2
5
1
5
8
2
0
9
5
7
9
0
0
2
5
7
3
0
7
7
0
4
3
6
0
3
1
5
4
2
0
0
5
2
8
0
7
1
0
2
3
0
6
6
0
5
6
5
5
1
1
5
1
2
0
4
4
3
7
1
5
1
5
8
2
0
8
5
0
6
0
5
5
0
1
5
9
1
0
0
4
6
6
8
3
1
0
6
2
0
3
5
0
7
6
4
6
9
0
8
1
0
7
3
1
6
5
2
1
0
4
2
0
9
4
0
8
3
4
0
9
0
7
1
0
5
3
7
5
8
1
1
0
2
2
0
6
4
0
9
0
4
4
8
0
6
1
0
2
3
3
5
0
1
1
5
0
2
0
3
4
0
0
1
8
3
9
7
0
5
1
5
0
3
0
5
3
0
1
5
9
1
0
0
4
g
n
i
t
t
i
F
e
z
i
S
e
p
i
P
l
a
n
i
m
o
N
½
¾
1
¼
1
ll
E
°
5
4
7
.
0
1
2
.
1
6
.
1
ll
E
°
0
9
6
.
1
1
.
2
6
.
2
5
.
3
)
w
o
b
l
E
s
A
(
e
e
T
1
.
3
1
.
4
2
.
5
9
.
6
c
i
f
i
c
e
p
S
y
t
i
v
a
r
G
n
o
i
t
c
e
r
r
o
C
r
o
t
c
a
F
c
i
f
i
c
e
p
S
y
t
i
v
a
r
G
n
o
i
t
c
e
r
r
o
C
r
o
t
c
a
F
0
5
.
0
0
1
.
1
0
3
.
1
7
0
.
1
5
5
.
0
4
0
.
1
0
4
.
1
4
0
.
1
0
6
.
0
0
0
.
1
0
5
.
1
0
0
.
1
5
6
.
0
6
9
.
0
0
6
.
1
7
9
.
0
0
7
.
0
3
9
.
0
0
7
.
1
4
9
.
0
5
7
.
0
0
9
.
0
0
8
.
0
7
8
.
0
Figure 6: Recommended Gas Piping
3. Install sediment trap, ground-joint union and manual
shut-off valve upstream of boiler gas control valve
and outside jacket. See Figure 6.
4. All above ground gas piping upstream from manual
shut-off valve must be electrically continuous and
bonded to a grounding electrode. Do not use gas
piping as grounding electrode. Refer to
National
Electrical Code
, ANSI/NFPA 70 and/or CSA C22
Electrical Code.
C.
Pressure test.
The boiler and its gas connection must
be leak tested before placing boiler in operation.
1. Protect boiler gas control valve. For all testing over
½ psig, boiler and its individual shut-off valve must
be disconnected from gas supply piping. For testing
at ½ psig or less, isolate boiler from gas supply
piping by closing boiler's individual manual shut-off
valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonfl ammable
solution. Do not use matches, candles, open fl ames,
or other ignition source.
Summary of Contents for 2PV Series
Page 19: ...19 Figure 17 Operating Instructions...
Page 20: ...20...
Page 21: ...21...
Page 22: ...22...
Page 32: ...32...