Page 8
29877-3 062005
INITIAL SETUP
CAUTION:
The brewer must be disconnected from the power source throughout the initial setup, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails of one of the brew stations.
2. Place an empty server under the funnel.
3. Connect the brewer to the power source. Water will begin flowing into the tank and stop when the tank is
filled to its capacity. Display will show
PLEASE WAIT...TANK FILLING
until tank is filled with water.
4. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature. Display will
show
READY TO BREW...WATER TEMP: XXX˚
when tank is at operating temperature.
5. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refill-
ing.
6. Water volumes have been preset at the factory. Refer to adjustments for the
Set Brew Volumes
section of
this manual should the volume need to be increased or decreased.
7. The brewer is now ready for use in accordance with the coffee brewing instructions.
COFFEE BREWING
1. Insert a BUNN filter into the Smart Funnel.
2. If a grinder is not used to obtain the coffee grounds, pour the proper amount of fresh coffee grounds into
the funnel and level by gently shaking. Slide the funnel into the funnel rails and select batch size. Proceed to
step 5.
3. If a G9-2T DBC or MHG grinder is used with a compatible Smart Funnel, select the desired batch size on the
grinder. Grind the selected amount of fresh coffee into funnel and level grounds by gently shaking. It is not
necessary to select a size on the brewer.
4. Slide the funnel into the funnel rails. The brewer will read the size ground through the chip in the funnel
handle and will automatically select the correct size to brew.
5. Place an empty server under the funnel.
6. The ENABLE BREW switch must be ON. Momentarily press and release the "BREW" switch. If the brewer has
the funnel lock option and if it is activated, once a brew cycle has been started the funnel is locked in place.
There may be certain situations in which the brew cycle will not begin when the brew switch is pressed:
a)
BREW TEMPERATURE TOO LOW
- wait until heated or cancel
BREW LOCKOUT
option.
b)
FUNNEL NOT IN PLACE
(or using a standard brew funnel) - cancel
FUNNEL DETECT
option.
c)
CHECK FUNNEL
- remove funnel, empty previously brewed grounds and grind a new batch into funnel.
d)
SERVER NOT IN PLACE
- place Soft Heat Server, or cancel
SERVER DETECT
option.
7. If none of the above messages are displayed, the display will read
NOW BREWING
and the time remaining
in the brew cycle. Arrows will point to the side which is brewing. If both sides are brewing simultaneously,
the arrows will alternate from left to right on the display.
8. Following the BREW will be a countdown of
DRIPPING
time which shows the time remaining until the funnel
lock will release. Discard the grounds and filter only after visible dripping stops.
CLEANING
1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all
surfaces on Bunn-O-Matic equipment.
2. Check and clean the sprayhead. Use the pointed end of sprayhead cleaning tool (#38227.0000) to remove
any mineral deposits from the sprayhead holes.
3. Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times to remove
any mineral deposits from the fitting.
4. Insert the short end of sprayhead cleaning tool into the bypass fitting, and rotate several times to remove
any mineral deposits from the fitting.
NOTE:
In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer
and takes less than a minute.