
MAKSİCONDENSE 48-65
Notes
03/2020
141
T
EKNİK EĞİTİM VE DESTEK
6.3.3
Filling the heating installation
1
Rinse the heating installation
2
Connect the filling/drain cock (2) to the on-site filling device
3
Open the water supply
4
Open the thermostatic valves
5
Open the service valves
6
Slowly open the filling/drain cock (1)
7
Open the purging nipple (3) and wait until the water escapes without bubbles. This nipple is
only used for the first filling
8
Monitor the filling pressure with the manometer, required filling pressure 1.5
–2.5 bar
9
Close the locks and check the pipe connections for tightness.
Summary of Contents for Thema Condens AS 48-A
Page 1: ...DEM RD K M MAKS CONDENSE 48 65...
Page 2: ......
Page 5: ...8 4 2 Gas consumption relating to nominal load 191 8 5 System checklist 192...
Page 6: ......
Page 12: ...MAKS CONDENSE 48 65 Notes 01 2018 6 Training 0020260859_00...
Page 28: ...MAKS CONDENSE 48 65 Notes 01 2018 22 Training 0020260859_00...
Page 44: ...MAKS CONDENSE 48 65 Notes 01 2018 38 Training 0020260859_00...
Page 110: ...MAKS CONDENSE 48 65 Notes 01 2018 104 Training 0020260859_00...
Page 122: ...MAKS CONDENSE 48 65 Notes 01 2018 116 Training 0020260859_00...
Page 124: ...MAKS CONDENSE 48 65 Notes 01 2018 118 Training 0020260859_00 C43P C53 C83 C83P C93 C63...
Page 146: ...MAKS CONDENSE 48 65 Notes 01 2018 140 Training 0020260859_00...
Page 156: ...MAKS CONDENSE 48 65 Notes 01 2018 150 Training 0020260859_00 6 4 Regional legislation...
Page 182: ...MAKS CONDENSE 48 65 Notes 01 2018 176 Training 0020260859_00...
Page 193: ...MAKS CONDENSE 48 65 Notes 03 2020 187 TEKN K E T M VE DESTEK...
Page 196: ...MAKS CONDENSE 48 65 Notes 01 2018 190 Training 0020260859_00...