background image

GAS 222.21 AMEX

4 Installation and connection

4.1 Installation site requirements

Sample gas probes are intended for flange mounting.

• Installation site and installation position are determined

based on requirements specific to the application.

• If necessary, the connection piece should be slightly tilted

toward the centre of the channel.

• The installation site should be protected from the

weather.

• In addition, adequate and safe access for installation and

future maintenance work should be provided. Particularly
follow the uninstalled size of the probe tube!

If the probe is transported to the installation site in pieces, it
will first need to be assembled.

4.2 Installation

DANGER

Danger to life and explosion during installation and
maintenance

The unit must not be worked on (assembly, installation,
maintenance) in explosive atmospheres.

DANGER

Explosion hazard

When used in explosive areas

Flammable gasses and dust could ignite or explode.

Never operate the gas probe outside the specifications. Ex-
tracting gases or gas mixtures which are also explosive in the
absence of air is prohibited.

DANGER

Explosion hazard due to ignition of dust

When using the device in a dusty environment, routinely
clean dust from all components.

The ignition temperature resp. smouldering temperature of
flammable dusts resp. dust layers present must be consider-
ably higher than the maximum surface temperature of the
device (observe applicable standards and statutory regula-
tions).

If possible, take the electrical components which must be
opened for repair to a dust-free room. If unable to do so, pre-
vent dust from entering the housing.

DANGER

Explosion hazard due to flame propagation

Severe injuries and damage to the system

If the process holds a risk of flame propagation, install a
flame arrestor.

4.3 Installing the sampling tube (optional)

The sampling tube, if necessary with the fitting extension,
must be screwed in. The probe is then attached to the mating
flange using the included seal and nuts.

4.4 Installing the outlet filter

NOTICE

The outlet filter and the O-ring for the handle must be inser-
ted prior to first startup.

Operating without outlet filter prohibited!

O-ring handle

Attach an O-ring suitable for the
expected ambient temperature
to the handle.

Attach the outlet filter to the
handle. Then carefully insert the
handle with filter in the gas
probe and turn 90° to secure.

Verify the handle is seated cor-
rectly. When seated correctly it
locks onto the filter housing.

4.5 Installing the Inlet Filter (Optional)

The inlet filter, if necessary with matching extension, must be
screwed in. The probe is then attached to the mating flange
using the included seals and screws.

4.6 Insulation

On heated probes completely insulate any exposed flange
areas and, if applicable, the connection piece to absolutely
prevent thermal bridges. The insulating material must meet
the application requirements and be weatherproof.

4.7 Connecting the Gas Line

The sample gas line must be carefully and properly connected
using a suitable fitting.

This table provides an overview of the sample gas probe con-
nections:

Probe

GAS 222

Reservoir

PAV01

Ball valve

pneumatic

drive

Control

valve

3/2-way

solenoid

valve

Connecting
flange 

1)

DN65/PN6/

DN3“-150 

2)

Sample gas
inlet

G3/4

Sample gas
outlet

NPT 1/4

Blowback
connection

G3/8

Test gas con-
nection 

1)

Tube Ø6 mm

Tube Ø1/4 

2)

Filling port

NPT 1/4

Condensate

G1/2

Bypass

NPT 1/4

Control air

G1/8

G1/4

NPT 1/4

Tab. 1: 

Gas Probe Connections (Varies by Model)

1)

 Varies by version.

2)

 Only GAS 222.xx ANSI and GAS 222.xx AMEX

10

Bühler Technologies GmbH

BX460050 ◦ 01/2020

Summary of Contents for GAS 222.21 AMEX

Page 1: ...460050 Version 01 2020 Ref 998BX460050 Analysentechnik Kurzanleitung Sonden deutsch 2 Brief Instructions Probes english 8 Notice de montage Sondes fran ais 14 Gu a r pida Sondas espa ol 20 chinese sim...

Page 2: ...en aufgrund m glicher adiaba tischer Kompression hoher R cksp ldruck gegen verschmutz ten Filter nicht zul ssig Das Einhalten dieser Bedingungen liegt im Verantwortungsbereich des Betreibers unter Zuh...

Page 3: ...osta tischen Entladungen kommen kann Reinigen Sie Geh useteile aus Kunststoff und Aufkleber nur mit einem feuchten Tuch Funkenbildung Sch tzen Sie das Betriebsmittel vor externen Schlageinwir kungen F...

Page 4: ...en Bringen Sie elektrische Betriebsmittel die zur Instandhaltung ge ffnet werden m ssen m glichst in einen staubfreien Raum Falls dies nicht m glich ist verhindern Sie das Eindrin gen von Staub in das...

Page 5: ...ann zerbrechen Vorsichtig behandeln nicht fallen lassen Nach Anschluss der Messgasleitung ist diese durch die Schelle abzufangen und zu sichern Bei l ngeren Messgasleitungen sind unter Umst nden weite...

Page 6: ...aturbest n digkeit 100 C besitzen Achten Sie auf ausreichende Zugentlastung des An schlusskabels Kabeldurchmesser dem Dichtungsring der W rfelstecker anpassen Beachten Sie dass beim Heizsystem kurzzei...

Page 7: ...t sind keine Teile der Gasentnahmesonde demontiert sind die Schutz und berwachungsvorrichtungen vorhanden und funktionsf hig sind z B Flammensperre der Gasein und Gasausgang der Gasentnahmesonde nicht...

Page 8: ...he probes is prohibited due to possible adiabatic com pression high blowback pressure against contaminated fil ter The operator is responsible for compliance with these conditions taking into account...

Page 9: ...tions do not frequently produce flammable electro static discharge Always clean plastic housing parts and decals with a damp cloth Sparking Protect the equipment from external blows Flame propagation...

Page 10: ...amage to the system If the process holds a risk of flame propagation install a flame arrestor 4 3 Installing the sampling tube optional The sampling tube if necessary with the fitting extension must b...

Page 11: ...pstream from the pressure vessel On probes used to sample flammable gas nitrogen inert gas must be used for blowback Blowback of explosive gases is prohibited NOTICE The operating pressure of the comp...

Page 12: ...g installation Install a strain relief for the cable connection Secure the cable against twist ing and loosening Please note the temperature resistance of the cables 100 C 212 F DANGER Adiabatic compr...

Page 13: ...tor s manual on the included CD or online at www buehler technologies com for maintenance informa tion 7 Service and Repair Please refer to the original operator s manual on the included CD or online...

Page 14: ...la LIE et la LSE avec les sondes n est pas autoris en raison d une possible compression adiabatique pression de r trolavage lev e contre le filtre encrass Le respect de ces conditions est de la respo...

Page 15: ...h tiques du bo tier ainsi que les au tocollants uniquement avec un linge humide Formation d tincelles Prot gez le moyen de production des chocs externes Retour de flammes En cas de risque de retour de...

Page 16: ...a temp rature maximum de surface de la sonde respectez les normes et la r glementa tion en vigueur Placer si possible l quipement de production lectrique de vant tre ouvert des fins d entretien dans u...

Page 17: ...a le re v tement isolant voire les mors isolants dans la zone de la conduite de gaz de mesure Desserrez pour cela les vis de fixation ATTENTION Risque de rupture Le mat riau isolant peut se briser man...

Page 18: ...ment Le raccor dement de la sortie d alarme doit tre fait par le biais d un cir cuit limit en nergie selon EN 60079 14 et 15 Umax 30 V Imax 100 mA Le raccordement se fait selon le plan d implanta tion...

Page 19: ...ifiez que qu les raccordements des tuyaux lectriques ainsi que le ru ban chauffant ne sont pas endommag s et qu ils sont cor rectement mont s aucun l ment de la sonde de pr l vement de gaz n est d mon...

Page 20: ...LSE con las sondas debido a la posible compresi n adiab tica alta presi n de retrolavado contra el filtro sucio El cumpli miento de estas condiciones es responsabilidad del operador con ayuda de su e...

Page 21: ...hispas Los equipos el ctricos solo deben instalarse en lugares en los que en un uso normal no suelan aparecer cargas electroest ticas inflamables Limpie las partes de pl stico de la carcasa y los adhe...

Page 22: ...perfi cie del aparato tenga en cuenta las normas y regulaciones le gales vigentes Si es posible lleve los equipos el ctricos que deban abrirse pa ra su mantenimiento a un espacio libre de polvo Si no...

Page 23: ...capa aislante y quitar tambi n las mordazas aislantes de la zo na del conducto de gas de muestreo Esto se lleva a cabo soltando los tornillos de fijaci n CUIDADO Peligro de rotura El material aislant...

Page 24: ...onexi n se reali za de acuerdo al esquema de asignaci n adjunto Para conectar el suministro el ctrico utilice nicamente cables con una resistencia t rmica de 100 C Aseg rese de que el cable de conexi...

Page 25: ...o est desmontada Los dispositivos de protecci n y control necesarios est n disponibles y operativos p ej supresor de llamas Las salidas y entradas de gas de la sonda de gas de mues treo no est n bloqu...

Page 26: ...49 0 21 02 49 89 20 1 1 ID 25 1 2 GAS 222 21 AMEX 100105177 462222116633000999999 001 CI 1 Div 2 Gps B C D T3 CSA Certificate 1728394 Install per drawing 46 115 Z01 06 4 115 230 V max 360W 230V at 20...

Page 27: ...GAS 222 21 AMEX 3 20 C 50 C 4 F bis 122 F 4 4 1 4 2 4 3 4 4 O O O 90 4 5 4 6 27 B hler Technologies GmbH BX460050 01 2020...

Page 28: ...NPT 1 4 G1 8 G1 4 NPT 1 4 1 1 2 GAS 222 xx ANSI GAS 222 xx AMEX 4 7 1 G3 8 4 7 2 NPT 1 4 4 7 3 6 mm 1 4 6mm 1 4 4 8 3 bar 44 psi 10 bar 145 psi a b 4 9 100 C 212 F EN 175301 803 DIN43650 115 230V 50...

Page 29: ...ax 30 V Imax 100 mA 1 kV 1 5 kV 4 9 1 PTC 115 230 V AC 100 C 100 C 212 F a b 5 5 1 Umax 30 V Imax 100 mA 6 CD www buehler technologies com 7 CD www buehler technologies com 29 B hler Technologies GmbH...

Page 30: ...nd 49 0 21 02 49 89 0 49 0 21 02 49 89 20 1 1 o 25 1 2 Year 2019 CSA GAS 222 21 AMEX 100105177 462222116633000999999 001 Cl 1 Div 2 Gps B C D T3 CSA Certificate 1728394 Install per drawing 46 115 Z01...

Page 31: ...GAS 222 21 AMEX a b c d a b c a b c 3 20 C 50 C 4 F 122 F 31 B hler Technologies GmbH BX460050 01 2020...

Page 32: ...GAS 222 21 AMEX 4 4 1 4 2 4 3 4 4 90 4 5 4 6 32 B hler Technologies GmbH BX460050 01 2020...

Page 33: ...1 3 2 1 DN65 PN6 DN3 150 2 G3 4 NPT 1 4 G3 8 1 6 1 4 2 NPT 1 4 G1 2 NPT 1 4 G1 8 G1 4 NPT 1 4 1 1 2 GAS 222 xx ANSI GAS 222 xx AMEX 4 7 1 G3 8 4 7 2 NPT 1 4 4 7 3 6 1 4 6 1 4 4 8 3 44 psi 33 B hler Te...

Page 34: ...2 21 AMEX 10 145 psi a b 4 9 100 C 212 F 4 EN 175301 803 ex DIN43650 115 230 50 60 EN 60079 14 15 U 30 I 100 100 C 4 6 8 U 30 I 100 1 1 5 4 9 1 115 230 AC 100 C 34 B hler Technologies GmbH BX460050 01...

Page 35: ...GAS 222 21 AMEX 100 C 212 F a b 5 5 1 U 30 I 100 6 www buehler technologies com 7 www buehler technologies com 35 B hler Technologies GmbH BX460050 01 2020...

Page 36: ...power supply Customer alarm output Probe power supply Heater power supply PAV 01 Alarm output M16 x 1 5 mm 4 5 10 mm M16 x 1 5 M16 x 1 5 2 Connection diagram heated pressure vessel Heater Operating vo...

Reviews: